IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

511

matching recommendations
Reset
SIC 2022 Cheese, Natural And Processed
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0098 # 06 Y:1994 06 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,962 $2,286 Implemented
IA0098 # 07 Y:1994 07 1994 DIRECT WARMEST AIR TO COMBUSTION INTAKE $698 $260 Not Implemented
KG0004 # 01 Y:1994 01 1994 INSTALL TIMERS AND/OR THERMOSTATS $8,700 $750 Not Implemented
KG0004 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,534 $5,580 Implemented
KG0004 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,538 $953 Implemented
KG0004 # 04 Y:1994 04 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,785 $617 Not Implemented
OR0156 # 01 Y:1992 01 1992 CHECK FOR ACCURACY OF UTILITY / POWER METERS $23,479 $0 Not Implemented
OR0156 # 02 Y:1992 02 1992 USE MINIMUM STEAM OPERATING PRESSURE $473 $0 Implemented
OR0156 # 03 Y:1992 03 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,966 $1,000 Implemented
OR0156 # 04 Y:1992 04 1992 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $200 $0 Implemented
OR0156 # 05 Y:1992 05 1992 INSTALL SET-BACK TIMERS $387 $360 Not Implemented
OR0156 # 06 Y:1992 06 1992 RECOVER AND REUSE COOLING WATER $3,527 $5,105 Implemented
OR0156 # 07 Y:1992 07 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $102 $164 Implemented
KU0360 # 01 Y:1991 01 1991 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $11,710 $6,000 Not Implemented
KU0360 # 02 Y:1991 02 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,473 $22,500 Not Implemented
KU0360 # 03 Y:1991 03 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,987 $150 Not Implemented
KU0360 # 04 Y:1991 04 1991 INSTALL AUTOMATIC STACK DAMPER $1,794 $2,525 Not Implemented
KU0360 # 05 Y:1991 05 1991 ISOLATE HOT OR COLD EQUIPMENT $1,192 $300 Not Implemented
KU0360 # 06 Y:1991 06 1991 INSTALL SET-BACK TIMERS $770 $1,900 Not Implemented
KU0360 # 07 Y:1991 07 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $377 $310 Not Implemented
WI0114 # 01 Y:1991 01 1991 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $18,289 $500 Not Implemented
WI0114 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,641 $2,520 Not Implemented
WI0114 # 03 Y:1991 03 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,486 $500 Not Implemented
WI0114 # 04 Y:1991 04 1991 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $229 $52 Not Implemented
WI0114 # 05 Y:1991 05 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $205 $0 Not Implemented