IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 2022 Cheese, Natural And Processed
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0995 # 09 Y:2019 09 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,887 $17,856 Implemented
UD0995 # 08 Y:2019 08 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $606 $0 Implemented
UD0995 # 07 Y:2019 07 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $5,847 $11,694 Implemented
UD0995 # 06 Y:2019 06 2019 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $35,713 $75,000 Not Implemented
UD0995 # 05 Y:2019 05 2019 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $110,256 $150,000 Not Implemented
UD0995 # 04 Y:2019 04 2019 OPTIMIZE PLANT POWER FACTOR $1,159 $3,500 Implemented
UD0995 # 03 Y:2019 03 2019 REPAIR OR REPLACE STEAM TRAPS $5,974 $1,800 Implemented
UD0995 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,443 $1,500 Implemented
UD0995 # 01 Y:2019 01 2019 INSTALL TIMERS AND/OR THERMOSTATS $3,767 $0 Not Implemented
UD0701 # 13 Y:2004 13 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,444 $3,294 Not Implemented
UD0701 # 16 Y:2004 16 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $261 $125 Not Implemented
UD0701 # 15 Y:2004 15 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $386 $174 Not Implemented
UD0701 # 14 Y:2004 14 2004 DISCONNECT BALLASTS $397 $30 Not Implemented
UD0701 # 01 Y:2004 01 2004 REDUCE OR ELIMINATE WASTE $85,956 $19,600 Not Implemented
UD0701 # 12 Y:2004 12 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,315 $16,140 Not Implemented
UD0701 # 11 Y:2004 11 2004 REPAIR AND ELIMINATE STEAM LEAKS $5,373 $146 Not Implemented
UD0701 # 10 Y:2004 10 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $5,896 $4,800 Not Implemented
UD0701 # 09 Y:2004 09 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,926 $0 Not Implemented
UD0701 # 08 Y:2004 08 2004 REDUCE EXCESSIVE BOILER BLOWDOWN $6,179 $4,000 Not Implemented
UD0701 # 07 Y:2004 07 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,577 $16,000 Not Implemented
UD0701 # 06 Y:2004 06 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,494 $1,500 Not Implemented
UD0701 # 05 Y:2004 05 2004 REDUCE VENTILATION AIR $22,847 $31,250 Not Implemented
UD0701 # 04 Y:2004 04 2004 REDUCE OR ELIMINATE WASTE $38,220 $620 Not Implemented
UD0701 # 03 Y:2004 03 2004 METER WASTE WATER $51,851 $15,700 Not Implemented
UD0701 # 02 Y:2004 02 2004 REDUCE EXCESSIVE BOILER BLOWDOWN $55,242 $1,619 Not Implemented