Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsSIC | 2022 | Cheese, Natural And Processed |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0132 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,999 | $680 | Not Implemented |
BS0132 # 03 Y:2019 | 03 | 2019 | OPERATE BOILERS ON HIGH FIRE SETTING | $51,880 | $0 | Not Implemented |
BS0132 # 04 Y:2019 | 04 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $11,835 | $21,198 | Not Implemented |
BS0132 # 05 Y:2019 | 05 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $19,164 | $15,537 | Not Implemented |
BS0132 # 06 Y:2019 | 06 | 2019 | INSTALL OCCUPANCY SENSORS | $5,715 | $8,435 | Not Implemented |
BS0132 # 07 Y:2019 | 07 | 2019 | REPAIR OR REPLACE STEAM TRAPS | $6,466 | $6,828 | Not Implemented |
BS0132 # 08 Y:2019 | 08 | 2019 | AVOID FROST FORMATION ON EVAPORATORS | $3,938 | $2,781 | Not Implemented |
BS0132 # 09 Y:2019 | 09 | 2019 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $10,840 | $16,194 | Not Implemented |
BS0132 # 10 Y:2019 | 10 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $682 | $1,005 | Not Implemented |
BS0132 # 11 Y:2019 | 11 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $14,577 | $12,760 | Not Implemented |
BS0132 # 01 Y:2019 | 01 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $21,247 | $10,080 | Not Implemented |
IP0125 # 04 Y:2019 | 04 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $908 | $1,344 | Implemented |
IP0125 # 08 Y:2019 | 08 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $133 | $390 | Implemented |
IP0125 # 07 Y:2019 | 07 | 2019 | REDUCE EXCESSIVE BOILER BLOWDOWN | $2,364 | $6,720 | Implemented |
IP0125 # 06 Y:2019 | 06 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,324 | $8,560 | Implemented |
IP0125 # 05 Y:2019 | 05 | 2019 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $269 | $500 | Implemented |
IP0125 # 03 Y:2019 | 03 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $932 | $315 | Implemented |
IP0125 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,180 | $354 | Implemented |
IP0125 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,774 | $150 | Not Implemented |
UD0995 # 01 Y:2019 | 01 | 2019 | INSTALL TIMERS AND/OR THERMOSTATS | $3,767 | $0 | Not Implemented |
UD0995 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,443 | $1,500 | Implemented |
UD0995 # 03 Y:2019 | 03 | 2019 | REPAIR OR REPLACE STEAM TRAPS | $5,974 | $1,800 | Implemented |
UD0995 # 04 Y:2019 | 04 | 2019 | OPTIMIZE PLANT POWER FACTOR | $1,159 | $3,500 | Implemented |
UD0995 # 05 Y:2019 | 05 | 2019 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $110,256 | $150,000 | Not Implemented |
UD0995 # 06 Y:2019 | 06 | 2019 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $35,713 | $75,000 | Not Implemented |