Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsSIC | 2023 | Dry, Condensed, Evaporated Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0220 # 11 Y:2005 | 11 | 2005 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $117 | $343 | Not Implemented |
SU0220 # 10 Y:2005 | 10 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $420 | $408 | Implemented |
SU0220 # 09 Y:2005 | 09 | 2005 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $119,913 | $75,924 | Not Implemented |
SU0220 # 08 Y:2005 | 08 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,271 | $667 | Implemented |
SU0220 # 07 Y:2005 | 07 | 2005 | REPAIR OR REPLACE STEAM TRAPS | $8,034 | $2,780 | Implemented |
SU0220 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,882 | $765 | Implemented |
SU0220 # 05 Y:2005 | 05 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $47,114 | $10,000 | Implemented |
SU0220 # 04 Y:2005 | 04 | 2005 | INSTALL TURBULATORS | $24,498 | $512 | Not Implemented |
SU0220 # 03 Y:2005 | 03 | 2005 | USE SYNTHETIC LUBRICANT | $488 | $0 | Implemented |
SU0220 # 01 Y:2005 | 01 | 2005 | KEEP BOILER TUBES CLEAN | $17,434 | $0 | Implemented |
SU0220 # 02 Y:2005 | 02 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,497 | $0 | Not Implemented |
SF0310 # 02 Y:2005 | 02 | 2005 | REPAIR AND ELIMINATE STEAM LEAKS | $728 | $120 | Not Implemented |
SF0310 # 10 Y:2005 | 10 | 2005 | USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS | $38,197 | $66,900 | Not Implemented |
SF0310 # 09 Y:2005 | 09 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,603 | $14,240 | Not Implemented |
SF0310 # 08 Y:2005 | 08 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $6,777 | $18,995 | Not Implemented |
SF0310 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,218 | $24,484 | Not Implemented |
SF0310 # 06 Y:2005 | 06 | 2005 | INSULATE BARE EQUIPMENT | $1,570 | $1,687 | Not Implemented |
SF0310 # 05 Y:2005 | 05 | 2005 | INSTALL OCCUPANCY SENSORS | $1,456 | $1,635 | Not Implemented |
SF0310 # 04 Y:2005 | 04 | 2005 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,150 | $2,900 | Not Implemented |
SF0310 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,633 | $3,457 | Not Implemented |
SF0310 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,347 | $480 | Not Implemented |
UU0080 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,095 | $3,040 | Not Implemented |
UU0080 # 02 Y:2005 | 02 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $5,900 | $0 | Not Implemented |
UU0080 # 03 Y:2005 | 03 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $681 | $2,276 | Not Implemented |
UU0080 # 04 Y:2005 | 04 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $23,294 | $70,000 | Not Implemented |