IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 2024 Ice Cream And Frozen Desserts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0256 # 09 Y:1999 09 1999 REDUCE OR ELIMINATE WASTE $23,643 $31,200 Not Implemented
ME0256 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,108 $11,800 Not Implemented
ME0256 # 02 Y:1999 02 1999 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,700 $900 Implemented
ME0256 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,563 $2,500 Implemented
ME0256 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $512 $185 Implemented
ME0256 # 05 Y:1999 05 1999 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $337 $400 Implemented
ME0256 # 06 Y:1999 06 1999 INSULATE BARE EQUIPMENT $325 $400 Implemented
ME0256 # 07 Y:1999 07 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $319 $590 Implemented
ME0256 # 08 Y:1999 08 1999 INSULATE BARE EQUIPMENT $236 $93 Implemented
ME0251 # 07 Y:1998 07 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,200 $1,850 Not Implemented
ME0251 # 06 Y:1998 06 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $160,875 $31,200 Implemented
ME0251 # 05 Y:1998 05 1998 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $448 $0 Implemented
ME0251 # 04 Y:1998 04 1998 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,020 $400 Implemented
ME0251 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,240 $2,100 Implemented
ME0251 # 02 Y:1998 02 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,440 $0 Not Implemented
ME0251 # 01 Y:1998 01 1998 INSULATE BARE EQUIPMENT $2,487 $600 Implemented
ME0248 # 10 Y:1998 10 1998 MINIMIZE WATER USAGE $7,418 $12,500 Not Implemented
ME0248 # 09 Y:1998 09 1998 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $550 $1,900 Implemented
ME0248 # 08 Y:1998 08 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,979 $4,070 Implemented
ME0248 # 07 Y:1998 07 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,270 $500 Implemented
ME0248 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,754 $750 Implemented
ME0248 # 05 Y:1998 05 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,421 $1,958 Implemented
ME0248 # 04 Y:1998 04 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,127 $6,773 Implemented
ME0248 # 03 Y:1998 03 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $12,685 $38,000 Not Implemented
ME0248 # 02 Y:1998 02 1998 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,099 $0 Implemented