Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
SIC 2026 Fluid Milk
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0484 # 03 Y:2020 03 2020 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $26,610 $79,200 Implemented
AS0484 # 01 Y:2020 01 2020 Install Anaerobic Digester $1,259,928 $10,007,562 Implemented
AS0471 # 04 Y:2019 04 2019 UPGRADE CONTROLS ON COMPRESSORS $157 $0 Implemented
AS0471 # 01 Y:2019 01 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $85,359 $279,692 Implemented
AS0464 # 06 Y:2019 06 2019 REPAIR AND ELIMINATE STEAM LEAKS $3,137 $348 Implemented
AS0464 # 01 Y:2019 01 2019 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $59,350 $126,000 Implemented
AS0463 # 01 Y:2019 01 2019 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $56,524 $90,000 Implemented
AS0463 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,693 $0 Implemented
AS0463 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,398 $6,295 Implemented
AS0460 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $190 $375 Implemented
AS0460 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $542 $1,624 Implemented
AS0460 # 02 Y:2018 02 2018 REPAIR AND ELIMINATE STEAM LEAKS $1,542 $300 Implemented
AS0425 # 04 Y:2006 04 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $382 $99 Implemented
AS0425 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,372 $15,000 Implemented
AS0425 # 01 Y:2006 01 2006 REPAIR AND ELIMINATE STEAM LEAKS $11,573 $500 Implemented
AS0377 # 06 Y:2004 06 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $193 $344 Implemented
AS0377 # 09 Y:2004 09 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $156,863 $200,000 Implemented
AS0377 # 08 Y:2004 08 2004 REPAIR AND ELIMINATE STEAM LEAKS $2,085 $40 Implemented
AS0377 # 07 Y:2004 07 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $331 $200 Implemented
AS0377 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $401 $816 Implemented
AS0377 # 04 Y:2004 04 2004 REDUCE VENTILATION AIR $1,236 $30 Implemented
AS0377 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,140 $20 Implemented
AS0377 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,107 $5,750 Implemented
AS0377 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,088 $120 Implemented
AS0328 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $540 $675 Implemented