IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 2026 Fluid Milk
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0958 # 12 Y:2016 12 2016 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,996 $0 Implemented
OK0958 # 11 Y:2016 11 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $16,955 $100,000 Implemented
OK0958 # 10 Y:2016 10 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $24,151 $70,000 Implemented
OK0958 # 09 Y:2016 09 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,455 $0 Implemented
OK0958 # 04 Y:2016 04 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,461 $2,000 Implemented
OK0958 # 03 Y:2016 03 2016 REPAIR AND ELIMINATE STEAM LEAKS $7,914 $3,250 Implemented
OK0958 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,735 $9,149 Implemented
KU0312 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,422 $8,763 Implemented
KU0312 # 04 Y:1990 04 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,778 $4,500 Implemented
KU0312 # 03 Y:1990 03 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,389 $7,925 Implemented
KU0312 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $135 $113 Implemented
KU0089 # 09 Y:1983 09 1983 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $117 $170 Implemented
KU0089 # 08 Y:1983 08 1983 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $182 $0 Implemented
KU0089 # 07 Y:1983 07 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $322 $550 Implemented
KU0089 # 06 Y:1983 06 1983 INCREASE AMOUNT OF CONDENSATE RETURNED $1,182 $1,044 Implemented
KU0089 # 05 Y:1983 05 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,992 $2,970 Implemented
KU0089 # 04 Y:1983 04 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,058 $2,580 Implemented
KU0089 # 03 Y:1983 03 1983 INSTALL TIMERS AND/OR THERMOSTATS $2,999 $200 Implemented
KU0089 # 02 Y:1983 02 1983 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $7,163 $100 Implemented
KU0089 # 01 Y:1983 01 1983 RECOVER WASTE HEAT FROM EQUIPMENT $7,499 $24,000 Implemented
KU0058 # 02 Y:1982 02 1982 RECOVER WASTE HEAT FROM EQUIPMENT $14,678 $24,000 Implemented
KU0058 # 07 Y:1982 07 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,260 $600 Implemented