Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,375
matching recommendationsSIC | 2026 | Fluid Milk |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0958 # 07 Y:2016 | 07 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,755 | $0 | Not Implemented |
OK0958 # 08 Y:2016 | 08 | 2016 | USE RADIANT HEATER FOR SPOT HEATING | $2,283 | $4,147 | Not Implemented |
OK0958 # 09 Y:2016 | 09 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,455 | $0 | Implemented |
OK0958 # 10 Y:2016 | 10 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $24,151 | $70,000 | Implemented |
OK0958 # 11 Y:2016 | 11 | 2016 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $16,955 | $100,000 | Implemented |
OK0958 # 12 Y:2016 | 12 | 2016 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,996 | $0 | Implemented |
OK0958 # 13 Y:2016 | 13 | 2016 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $309,693 | $1,927,657 | Not Implemented |
NC0583 # 01 Y:2017 | 01 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $61,111 | $160,000 | Not Implemented |
NC0583 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,519 | $6,412 | Implemented |
NC0583 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,025 | $200 | Implemented |
NC0583 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,222 | $100 | Not Implemented |
NC0583 # 05 Y:2017 | 05 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,456 | $7,000 | Not Implemented |
NC0583 # 06 Y:2017 | 06 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $2,529 | $5,865 | Implemented |
NC0583 # 07 Y:2017 | 07 | 2017 | INSULATE FEEDWATER TANK | $665 | $1,106 | Implemented |
OR0672 # 01 Y:2016 | 01 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,924 | $26,614 | Not Implemented |
OR0672 # 02 Y:2016 | 02 | 2016 | INCREASE AMOUNT OF CONDENSATE RETURNED | $21,014 | $35,396 | Not Implemented |
OR0672 # 03 Y:2016 | 03 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $39,775 | $138,248 | Not Implemented |
UK1511 # 01 Y:2015 | 01 | 2015 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $457,639 | $1,000,000 | Implemented |
UK1511 # 02 Y:2015 | 02 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $42,293 | $0 | Not Implemented |
UK1511 # 03 Y:2015 | 03 | 2015 | OPTIMIZE PLANT POWER FACTOR | $9,011 | $8,260 | Implemented |
UK1511 # 04 Y:2015 | 04 | 2015 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $596 | $0 | Implemented |
UK1511 # 05 Y:2015 | 05 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,582 | $51,370 | Implemented |
UK1511 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,159 | $1,371 | Implemented |
UK1511 # 07 Y:2015 | 07 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,050 | $0 | Implemented |
UK1511 # 08 Y:2015 | 08 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $737 | $1,500 | Implemented |