IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
Reset
SIC 2026 Fluid Milk
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0586 # 02 Y:2000 02 2000 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $99,635 $350,000 Not Implemented
UD0586 # 03 Y:2000 03 2000 $96,665 $5,000 Not Implemented
UD0586 # 04 Y:2000 04 2000 MINIMIZE WATER USAGE $18,654 $298 Implemented
UD0586 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,183 $0 Implemented
UD0586 # 06 Y:2000 06 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,583 $0 Not Implemented
WV0109 # 10 Y:1997 10 1997 $46,800 $0 Not Implemented
WV0109 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,527 $5,295 Implemented
WV0109 # 02 Y:1997 02 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,337 $384 Implemented
WV0109 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $616 $478 Not Implemented
WV0109 # 04 Y:1997 04 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $962 $15 Not Implemented
WV0109 # 05 Y:1997 05 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $26,265 $3,000 Implemented
WV0109 # 06 Y:1997 06 1997 DIRECT WARMEST AIR TO COMBUSTION INTAKE $7,904 $6,300 Implemented
WV0109 # 07 Y:1997 07 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $1,550 $441 Implemented
WV0109 # 08 Y:1997 08 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $35,000 $5,000 Not Implemented
WV0109 # 09 Y:1997 09 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $5,200 $200 Not Implemented
UD0434 # 05 Y:1994 05 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,045 $300 Implemented
UD0434 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,504 $12,960 Implemented
UD0434 # 03 Y:1994 03 1994 USE POWER DURING OFF-PEAK PERIODS $13,081 $0 Implemented
UD0434 # 02 Y:1994 02 1994 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $14,462 $7,500 Implemented
UD0434 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $4,831 $8,000 Implemented
UD0034 # 05 Y:1982 05 1982 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $761 $400 Not Implemented
UD0034 # 04 Y:1982 04 1982 REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS $46,072 $120,000 Not Implemented
UD0034 # 03 Y:1982 03 1982 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $252 $100 Not Implemented
UD0034 # 02 Y:1982 02 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $851 $0 Implemented
UD0034 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,098 $2,149 Not Implemented