IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

109

matching recommendations
Reset
SIC 2026 Fluid Milk
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0516 # 05 Y:2018 05 2018 REPAIR AND ELIMINATE STEAM LEAKS $488 $200 Implemented
SF0516 # 06 Y:2018 06 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $906 $468 Implemented
SF0516 # 07 Y:2018 07 2018 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $32,827 $20,000 Implemented
SF0516 # 08 Y:2018 08 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $28,367 $15,956 Implemented
SF0516 # 09 Y:2018 09 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,509 $36,186 Implemented
SF0516 # 10 Y:2018 10 2018 INCREASE AMOUNT OF CONDENSATE RETURNED $17,989 $48,803 Not Implemented
SF0516 # 11 Y:2018 11 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,207 $7,506 Implemented
SF0516 # 12 Y:2018 12 2018 REPLACE BOILER $110,920 $948,704 Not Implemented
SF0516 # 13 Y:2018 13 2018 RECYCLE WHITE WATER $55,700 $17,768 Not Implemented
SF0459 # 01 Y:2015 01 2015 REPAIR OR REPLACE STEAM TRAPS $29,918 $5,047 Implemented
SF0459 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $391 $0 Implemented
SF0459 # 03 Y:2015 03 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $196,316 $40,788 Not Implemented
SF0459 # 04 Y:2015 04 2015 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $41,206 $19,989 Not Implemented
SF0459 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,624 $15,013 Not Implemented
SF0459 # 06 Y:2015 06 2015 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $23,360 $14,429 Implemented
SF0459 # 07 Y:2015 07 2015 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $3,292 $1,945 Implemented
SF0459 # 08 Y:2015 08 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,977 $11,607 Not Implemented
SF0459 # 09 Y:2015 09 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,959 $6,271 Not Implemented
SF0459 # 10 Y:2015 10 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,935 $5,491 Not Implemented
SF0459 # 11 Y:2015 11 2015 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $17,754 $22,786 Implemented
SF0459 # 12 Y:2015 12 2015 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $58,197 $81,522 Implemented
SF0459 # 13 Y:2015 13 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,158 $24,030 Implemented
SF0459 # 14 Y:2015 14 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $42,975 $82,916 Implemented
SF0459 # 15 Y:2015 15 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,707 $39,862 Not Implemented
SF0459 # 16 Y:2015 16 2015 INSTALL OCCUPANCY SENSORS $6,651 $23,688 Not Implemented