IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

79

matching recommendations
Reset
SIC 2026 Fluid Milk
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0197 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,301 $0 Not Implemented
SU0197 # 03 Y:2004 03 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,966 $0 Implemented
SU0197 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,301 $154 Implemented
SU0197 # 05 Y:2004 05 2004 INSTALL TURBULATORS $3,875 $350 Not Implemented
SU0197 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,462 $725 Implemented
SU0197 # 08 Y:2004 08 2004 BURN A LESS EXPENSIVE GRADE OF FUEL $26,570 $16,638 Not Implemented
SU0197 # 09 Y:2004 09 2004 OPTIMIZE PLANT POWER FACTOR $2,001 $6,941 Implemented
SU0184 # 07 Y:2004 07 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,570 $26,324 Not Implemented
SU0184 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,982 $0 Implemented
SU0184 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,593 $1,000 Implemented
SU0184 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $3,478 $574 Implemented
SU0184 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,876 $2,584 Implemented
SU0184 # 06 Y:2004 06 2004 USE SYNTHETIC LUBRICANT $2,480 $2,000 Implemented
SU0184 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,125 $15,744 Implemented
SU0184 # 05 Y:2004 05 2004 OPTIMIZE PLANT POWER FACTOR $5,619 $2,410 Implemented
HO0235 # 05 Y:2000 05 2000 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $34,444 $20,000 Implemented
HO0235 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,960 $11,729 Not Implemented
HO0235 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,410 $15 Not Implemented
HO0235 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,255 $600 Implemented
HO0235 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,126 $5,000 Implemented
HO0235 # 06 Y:2000 06 2000 COMBINE UTILITY METERS $4,142 $6,000 Not Implemented
HO0235 # 07 Y:2000 07 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $115,354 $4,000 Not Implemented
HO0235 # 08 Y:2000 08 2000 IMPROVE SPACE COMFORT CONDITIONING $4,200 $375 Implemented
HO0235 # 09 Y:2000 09 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $524 $2,500 Implemented
HO0007 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $690 $0 Not Implemented