IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,375

matching recommendations
Reset
SIC 2026 Fluid Milk
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0187 # 06 Y:1990 06 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $935 $1,700 Not Implemented
CO0187 # 07 Y:1990 07 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $830 $1,000 Implemented
CO0187 # 08 Y:1990 08 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $576 $267 Implemented
CO0186 # 01 Y:1990 01 1990 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $21,069 $250 Implemented
CO0186 # 02 Y:1990 02 1990 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $15,600 $4,000 Implemented
CO0186 # 03 Y:1990 03 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,600 $1,000 Implemented
CO0186 # 04 Y:1990 04 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,720 $2,000 Implemented
CO0186 # 05 Y:1990 05 1990 INSTALL TIMERS AND/OR THERMOSTATS $1,240 $600 Not Implemented
CO0186 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,110 $2,000 Implemented
TN0394 # 01 Y:1990 01 1990 HEAT WATER WITH EXHAUST HEAT $54,274 $73,320 Not Implemented
TN0394 # 02 Y:1990 02 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $5,454 $2,060 Implemented
TN0394 # 03 Y:1990 03 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,219 $1,000 Not Implemented
TN0394 # 04 Y:1990 04 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,298 $0 Implemented
TN0394 # 05 Y:1990 05 1990 INSULATE BARE EQUIPMENT $513 $565 Not Implemented
TN0394 # 06 Y:1990 06 1990 INSTALL TIMERS AND/OR THERMOSTATS $1,838 $840 Implemented
TN0394 # 07 Y:1990 07 1990 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $668 $1,963 Implemented
TN0394 # 08 Y:1990 08 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $451 $270 Implemented
TN0394 # 09 Y:1990 09 1990 INSULATE BARE EQUIPMENT $167 $459 Implemented
CO0179 # 01 Y:1990 01 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,400 $1,500 Implemented
CO0179 # 02 Y:1990 02 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,400 $500 Implemented
CO0179 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $358 $339 Implemented
CO0179 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $120 $700 Implemented
CO0179 # 05 Y:1990 05 1990 ELIMINATE LEAKS IN WATER LINES AND VALVES $2,480 $350 Implemented
KU0309 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,546 $12,840 Implemented
KU0309 # 02 Y:1990 02 1990 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $10,130 $10,000 Not Implemented