IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,375

matching recommendations
Reset
SIC 2026 Fluid Milk
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0309 # 03 Y:1990 03 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,042 $4,000 Implemented
KU0309 # 04 Y:1990 04 1990 TREAT AND REUSE RINSE WATERS $5,895 $4,000 Implemented
KU0309 # 05 Y:1990 05 1990 INSULATE BARE EQUIPMENT $386 $300 Implemented
KU0309 # 06 Y:1990 06 1990 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $126 $180 Implemented
KU0309 # 07 Y:1990 07 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $22,428 $20,000 Not Implemented
KU0309 # 08 Y:1990 08 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,990 $2,400 Implemented
KU0312 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,422 $8,763 Implemented
KU0312 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $135 $113 Implemented
KU0312 # 03 Y:1990 03 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,389 $7,925 Implemented
KU0312 # 04 Y:1990 04 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,778 $4,500 Implemented
KU0312 # 05 Y:1990 05 1990 INSTALL AUTOMATIC STACK DAMPER $1,354 $1,700 Not Implemented
CO0161 # 01 Y:1989 01 1989 AVOID FROST FORMATION ON EVAPORATORS $1,340 $3,000 Not Implemented
CO0161 # 02 Y:1989 02 1989 INSTALL TIMERS AND/OR THERMOSTATS $290 $300 Implemented
CO0161 # 03 Y:1989 03 1989 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $300 $100 Implemented
CO0161 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $90 $105 Implemented
CO0161 # 05 Y:1989 05 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $390 $330 Implemented
CO0161 # 06 Y:1989 06 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $280 $0 Implemented
CO0161 # 07 Y:1989 07 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $214 $350 Not Implemented
CO0161 # 08 Y:1989 08 1989 TURN OFF STEAM TRACING DURING MILD WEATHER $170 $200 Implemented
MA0153 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,825 $500 Implemented
MA0153 # 04 Y:1989 04 1989 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $19,722 $115,000 Not Implemented
MA0153 # 05 Y:1989 05 1989 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,985 $1,910 Not Implemented
MA0153 # 06 Y:1989 06 1989 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $530 $218 Not Implemented
MA0153 # 07 Y:1989 07 1989 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,615 $3,000 Not Implemented
MA0153 # 01 Y:1989 01 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $632 $217 Not Implemented