IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,381

matching recommendations
Reset
SIC 2026 Fluid Milk
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0153 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,825 $500 Implemented
MA0153 # 04 Y:1989 04 1989 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $19,722 $115,000 Not Implemented
MA0153 # 05 Y:1989 05 1989 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,985 $1,910 Not Implemented
MA0153 # 06 Y:1989 06 1989 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $530 $218 Not Implemented
MA0153 # 07 Y:1989 07 1989 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,615 $3,000 Not Implemented
MA0153 # 01 Y:1989 01 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $632 $217 Not Implemented
MA0153 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $878 $163 Implemented
OR0041 # 01 Y:1988 01 1988 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $527 $0 Not Implemented
OR0041 # 02 Y:1988 02 1988 USE MINIMUM STEAM OPERATING PRESSURE $254 $0 Implemented
OR0041 # 03 Y:1988 03 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $949 $300 Implemented
OR0041 # 04 Y:1988 04 1988 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $941 $475 Not Implemented
OR0041 # 05 Y:1988 05 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $158 $136 Not Implemented
OR0041 # 06 Y:1988 06 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $2,075 $1,966 Not Implemented
OR0041 # 07 Y:1988 07 1988 INSULATE FEEDWATER TANK $94 $177 Not Implemented
LT0135 # 01 Y:1988 01 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $860 $0 Not Implemented
LT0135 # 02 Y:1988 02 1988 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $457 $275 Not Implemented
LT0135 # 03 Y:1988 03 1988 INSULATE BARE EQUIPMENT $551 $1,354 Not Implemented
LT0135 # 04 Y:1988 04 1988 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,470 $0 Not Implemented
LT0135 # 05 Y:1988 05 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $715 $146 Not Implemented
LT0135 # 06 Y:1988 06 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $402 $0 Not Implemented
LT0135 # 07 Y:1988 07 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $226 $571 Not Implemented
LT0135 # 08 Y:1988 08 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $383 $0 Not Implemented
LT0135 # 09 Y:1988 09 1988 INSTALL TIMERS AND/OR THERMOSTATS $529 $129 Not Implemented
LT0135 # 10 Y:1988 10 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $640 $770 Not Implemented
LT0135 # 11 Y:1988 11 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $121 $85 Not Implemented