Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
92
matching recommendationsSIC | 2026 | Fluid Milk |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0041 # 01 Y:1988 | 01 | 1988 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $527 | $0 | Not Implemented |
OR0041 # 02 Y:1988 | 02 | 1988 | USE MINIMUM STEAM OPERATING PRESSURE | $254 | $0 | Implemented |
OR0041 # 03 Y:1988 | 03 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $949 | $300 | Implemented |
OR0041 # 04 Y:1988 | 04 | 1988 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $941 | $475 | Not Implemented |
OR0041 # 05 Y:1988 | 05 | 1988 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $158 | $136 | Not Implemented |
OR0041 # 07 Y:1988 | 07 | 1988 | INSULATE FEEDWATER TANK | $94 | $177 | Not Implemented |
OR0041 # 06 Y:1988 | 06 | 1988 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,075 | $1,966 | Not Implemented |
LT0135 # 03 Y:1988 | 03 | 1988 | INSULATE BARE EQUIPMENT | $551 | $1,354 | Not Implemented |
LT0135 # 13 Y:1988 | 13 | 1988 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $333 | $1,770 | Not Implemented |
LT0135 # 12 Y:1988 | 12 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,312 | $3,363 | Not Implemented |
LT0135 # 11 Y:1988 | 11 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $121 | $85 | Not Implemented |
LT0135 # 10 Y:1988 | 10 | 1988 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $640 | $770 | Not Implemented |
LT0135 # 09 Y:1988 | 09 | 1988 | INSTALL TIMERS AND/OR THERMOSTATS | $529 | $129 | Not Implemented |
LT0135 # 08 Y:1988 | 08 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $383 | $0 | Not Implemented |
LT0135 # 07 Y:1988 | 07 | 1988 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $226 | $571 | Not Implemented |
LT0135 # 06 Y:1988 | 06 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $402 | $0 | Not Implemented |
LT0135 # 05 Y:1988 | 05 | 1988 | INSTALL / REPAIR INSULATION ON STEAM LINES | $715 | $146 | Not Implemented |
LT0135 # 04 Y:1988 | 04 | 1988 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,470 | $0 | Not Implemented |
LT0135 # 01 Y:1988 | 01 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $860 | $0 | Not Implemented |
LT0135 # 02 Y:1988 | 02 | 1988 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $457 | $275 | Not Implemented |
OR0036 # 06 Y:1988 | 06 | 1988 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $129 | $100 | Implemented |
OR0036 # 01 Y:1988 | 01 | 1988 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $752 | $0 | Implemented |
OR0036 # 03 Y:1988 | 03 | 1988 | INSTALL SET-BACK TIMERS | $855 | $0 | Implemented |
OR0036 # 07 Y:1988 | 07 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $54 | $89 | Implemented |
OR0036 # 02 Y:1988 | 02 | 1988 | USE MINIMUM STEAM OPERATING PRESSURE | $523 | $0 | Not Implemented |