IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 2026 Fluid Milk
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0160 # 07 Y:1992 07 1992 INSTALL TIMERS AND/OR THERMOSTATS $268 $600 Not Implemented
WI0160 # 01 Y:1992 01 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,410 $3,576 Not Implemented
WI0160 # 05 Y:1992 05 1992 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $463 $1,400 Not Implemented
WI0160 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,046 $500 Implemented
WI0160 # 03 Y:1992 03 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,080 $960 Not Implemented
WI0160 # 04 Y:1992 04 1992 RECOVER WASTE HEAT FROM EQUIPMENT $994 $1,200 Not Implemented
GT0477 # 08 Y:1992 08 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,200 $6,500 Not Implemented
GT0477 # 07 Y:1992 07 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $330 $690 Not Implemented
GT0477 # 06 Y:1992 06 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,120 $550 Not Implemented
GT0477 # 05 Y:1992 05 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,470 $450 Not Implemented
GT0477 # 04 Y:1992 04 1992 HEAT WATER WITH EXHAUST HEAT $690 $1,490 Not Implemented
GT0477 # 03 Y:1992 03 1992 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $140 $100 Not Implemented
GT0477 # 02 Y:1992 02 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,233 $27,230 Not Implemented
GT0477 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,693 $8,240 Not Implemented
WI0160 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $541 $0 Not Implemented
WI0160 # 08 Y:1992 08 1992 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $127 $0 Not Implemented
ND0034 # 04 Y:1992 04 1992 REPAIR OR REPLACE STEAM TRAPS $812 $650 Not Implemented
ND0034 # 05 Y:1992 05 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $689 $250 Not Implemented
ND0034 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $667 $324 Not Implemented
ND0034 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,724 $680 Not Implemented
ND0034 # 02 Y:1992 02 1992 INSULATE BARE EQUIPMENT $2,439 $2,439 Not Implemented
ND0034 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,322 $11,510 Not Implemented
ND0034 # 07 Y:1992 07 1992 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $58 $231 Not Implemented
AM0152 # 06 Y:1992 06 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,010 $1,080 Not Implemented
AM0152 # 05 Y:1992 05 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,400 $0 Not Implemented