IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
SIC 2026 Fluid Milk
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0235 # 09 Y:2000 09 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $524 $2,500 Implemented
HO0235 # 08 Y:2000 08 2000 IMPROVE SPACE COMFORT CONDITIONING $4,200 $375 Implemented
HO0235 # 07 Y:2000 07 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $115,354 $4,000 Not Implemented
HO0235 # 06 Y:2000 06 2000 COMBINE UTILITY METERS $4,142 $6,000 Not Implemented
HO0235 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,960 $11,729 Not Implemented
HO0235 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,410 $15 Not Implemented
HO0235 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,255 $600 Implemented
HO0235 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,126 $5,000 Implemented
HO0235 # 05 Y:2000 05 2000 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $34,444 $20,000 Implemented
IA0251 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,361 $0 Not Implemented
IA0251 # 04 Y:2000 04 2000 INSTALL OCCUPANCY SENSORS $1,574 $3,390 Not Implemented
IA0251 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,901 $13,746 Implemented
IA0251 # 02 Y:2000 02 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $6,280 $0 Implemented
IA0251 # 01 Y:2000 01 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,446 $6,216 Not Implemented
IA0251 # 07 Y:2000 07 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,508 $95 Not Implemented
IA0251 # 08 Y:2000 08 2000 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,408 $1,400 Not Implemented
IA0251 # 09 Y:2000 09 2000 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $2,002 $1,058 Not Implemented
IA0251 # 10 Y:2000 10 2000 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $22,300 $70,000 Implemented
IA0251 # 11 Y:2000 11 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,982 $285 Implemented
IA0251 # 12 Y:2000 12 2000 INSULATE BARE EQUIPMENT $2,786 $334 Implemented
IA0251 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $532 $399 Not Implemented
IA0252 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,422 $1,421 Implemented
IA0252 # 10 Y:2000 10 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $88,850 $88,849 Not Implemented
IA0252 # 01 Y:2000 01 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,486 $2,487 Not Implemented
IA0252 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,923 $1,921 Implemented