Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
52
matching recommendationsSIC | 2026 | Fluid Milk |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
HO0235 # 09 Y:2000 | 09 | 2000 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $524 | $2,500 | Implemented |
HO0235 # 08 Y:2000 | 08 | 2000 | IMPROVE SPACE COMFORT CONDITIONING | $4,200 | $375 | Implemented |
HO0235 # 07 Y:2000 | 07 | 2000 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $115,354 | $4,000 | Not Implemented |
HO0235 # 06 Y:2000 | 06 | 2000 | COMBINE UTILITY METERS | $4,142 | $6,000 | Not Implemented |
HO0235 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,960 | $11,729 | Not Implemented |
HO0235 # 02 Y:2000 | 02 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,410 | $15 | Not Implemented |
HO0235 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,255 | $600 | Implemented |
HO0235 # 04 Y:2000 | 04 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $12,126 | $5,000 | Implemented |
HO0235 # 05 Y:2000 | 05 | 2000 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $34,444 | $20,000 | Implemented |
IA0251 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,361 | $0 | Not Implemented |
IA0251 # 04 Y:2000 | 04 | 2000 | INSTALL OCCUPANCY SENSORS | $1,574 | $3,390 | Not Implemented |
IA0251 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,901 | $13,746 | Implemented |
IA0251 # 02 Y:2000 | 02 | 2000 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $6,280 | $0 | Implemented |
IA0251 # 01 Y:2000 | 01 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,446 | $6,216 | Not Implemented |
IA0251 # 07 Y:2000 | 07 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,508 | $95 | Not Implemented |
IA0251 # 08 Y:2000 | 08 | 2000 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $2,408 | $1,400 | Not Implemented |
IA0251 # 09 Y:2000 | 09 | 2000 | REPLACE AIR CURTAIN DOORS WITH SOLID DOORS | $2,002 | $1,058 | Not Implemented |
IA0251 # 10 Y:2000 | 10 | 2000 | ELIMINATE PRACTICE OF MIXING WASTE STREAMS | $22,300 | $70,000 | Implemented |
IA0251 # 11 Y:2000 | 11 | 2000 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $3,982 | $285 | Implemented |
IA0251 # 12 Y:2000 | 12 | 2000 | INSULATE BARE EQUIPMENT | $2,786 | $334 | Implemented |
IA0251 # 06 Y:2000 | 06 | 2000 | INSTALL OCCUPANCY SENSORS | $532 | $399 | Not Implemented |
IA0252 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,422 | $1,421 | Implemented |
IA0252 # 10 Y:2000 | 10 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $88,850 | $88,849 | Not Implemented |
IA0252 # 01 Y:2000 | 01 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,486 | $2,487 | Not Implemented |
IA0252 # 02 Y:2000 | 02 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,923 | $1,921 | Implemented |