Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsSIC | 2026 | Fluid Milk |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0308 # 06 Y:2002 | 06 | 2002 | INCREASE USE OF AUTOMATION | $91,000 | $75,000 | Not Implemented |
SD0308 # 05 Y:2002 | 05 | 2002 | USE PHOTOCELL CONTROLS | $525 | $500 | Not Implemented |
SD0308 # 04 Y:2002 | 04 | 2002 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $1,853 | $0 | Not Implemented |
SD0308 # 03 Y:2002 | 03 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,224 | $5,000 | Not Implemented |
SD0308 # 02 Y:2002 | 02 | 2002 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $7,470 | $6,000 | Not Implemented |
SD0308 # 01 Y:2002 | 01 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $168,158 | $56,000 | Not Implemented |
OR0416 # 01 Y:2002 | 01 | 2002 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $140,000 | $790,000 | Not Implemented |
OR0416 # 02 Y:2002 | 02 | 2002 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $19,366 | $0 | Not Implemented |
OR0416 # 03 Y:2002 | 03 | 2002 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $13,308 | $0 | Not Implemented |
OR0416 # 04 Y:2002 | 04 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,862 | $1,500 | Not Implemented |
OR0416 # 05 Y:2002 | 05 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $32,840 | $32,942 | Not Implemented |
OR0416 # 06 Y:2002 | 06 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $11,200 | $0 | Not Implemented |
OR0416 # 07 Y:2002 | 07 | 2002 | OPTIMIZE PLANT POWER FACTOR | $15,524 | $38,000 | Not Implemented |
WV0246 # 03 Y:2002 | 03 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,539 | $0 | Implemented |
WV0246 # 12 Y:2002 | 12 | 2002 | PAY BILLS ON TIME TO AVOID LATE FEES | $2,301 | $0 | Implemented |
WV0246 # 04 Y:2002 | 04 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,277 | $240 | Implemented |
WV0246 # 05 Y:2002 | 05 | 2002 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $5,200 | $400 | Implemented |
WV0246 # 06 Y:2002 | 06 | 2002 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,264 | $2,255 | Not Implemented |
WV0246 # 07 Y:2002 | 07 | 2002 | INSTALL SPECTRAL REFLECTORS / DELAMP | $621 | $1,140 | Not Implemented |
WV0246 # 08 Y:2002 | 08 | 2002 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $787 | $1,300 | Not Implemented |
WV0246 # 09 Y:2002 | 09 | 2002 | INSULATE BARE EQUIPMENT | $3,472 | $2,563 | Implemented |
WV0246 # 10 Y:2002 | 10 | 2002 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $458 | $830 | Implemented |
WV0246 # 11 Y:2002 | 11 | 2002 | RECOVER AND REUSE COOLING WATER | $5,769 | $5,000 | Not Implemented |
WV0246 # 02 Y:2002 | 02 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $249 | $0 | Implemented |
WV0246 # 01 Y:2002 | 01 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $656 | $600 | Not Implemented |