Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,930

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0247 # 05 Y:2025 05 2025 TURN OFF EQUIPMENT WHEN NOT IN USE $399 $0 n/a
DL0247 # 06 Y:2025 06 2025 TURN OFF EQUIPMENT WHEN NOT IN USE $993 $0 n/a
DL0247 # 07 Y:2025 07 2025 METER WASTE WATER $34,580 $145 n/a
DL0247 # 02 Y:2025 02 2025 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,382 $0 n/a
DL0247 # 04 Y:2025 04 2025 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS $1,592 $0 n/a
DL0247 # 01 Y:2025 01 2025 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $350 $0 n/a
DL0247 # 08 Y:2025 08 2025 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $27,958 $200,000 n/a
DL0247 # 03 Y:2025 03 2025 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,671 $0 n/a
DL0247 # 09 Y:2025 09 2025 UTILIZE A LESS EXPENSIVE COOLING METHOD $116,551 $1,000,000 n/a
AS0590 # 03 Y:2024 03 2024 PAY BILLS ON TIME TO AVOID LATE FEES $3,038 $39 n/a
AS0590 # 01 Y:2024 01 2024 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $33,333 $1,245 n/a
AS0590 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $17,979 $93,198 n/a
AS0590 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,358 $1,128 n/a
AS0590 # 05 Y:2024 05 2024 REDUCE HEAT GAIN BY WINDOW TINTING $196 $299 n/a
UU0259 # 05 Y:2024 05 2024 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $53,643 $33,000 n/a
UU0259 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $221,450 $2,473,450 n/a
UU0259 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $205,038 $1,865,253 n/a
UU0259 # 06 Y:2024 06 2024 INSTALL COMMON HEADER ON COMPRESSORS $3,995 $9,200 n/a
UU0259 # 01 Y:2024 01 2024 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $3,866,540 $17,885,484 n/a
UU0259 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $68,165 $110,030 n/a
LS2413 # 01 Y:2024 01 2024 UPGRADE CONTROLS ON COMPRESSORS $68,225 $155,400 n/a
LS2413 # 02 Y:2024 02 2024 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $5,076 $16,000 n/a
LS2413 # 03 Y:2024 03 2024 INSTALL SENSORS TO DETECT DEFECTS $5,700 $30,000 n/a
UL2406 # 01 Y:2024 01 2024 OPTIMIZE PLANT POWER FACTOR $21,720 $14,950 n/a
UL2406 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,544 $12,225 n/a