Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
12
matching recommendationsSIC | 203 | Preserved Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0746 # 01 Y:2007 | 01 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $32,026 | $30,757 | Implemented |
OK0746 # 04 Y:2007 | 04 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,580 | $4,541 | Implemented |
OK0746 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,287 | $3,000 | Implemented |
OK0746 # 06 Y:2007 | 06 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,881 | $3,256 | Implemented |
OK0746 # 07 Y:2007 | 07 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,881 | $0 | Implemented |
OK0519 # 01 Y:1997 | 01 | 1997 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $178,301 | $18,000 | Implemented |
OK0519 # 02 Y:1997 | 02 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,853 | $15,000 | Implemented |
OK0519 # 03 Y:1997 | 03 | 1997 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,927 | $0 | Implemented |
OK0519 # 04 Y:1997 | 04 | 1997 | USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) | $14,177 | $20,000 | Implemented |
OK0519 # 06 Y:1997 | 06 | 1997 | USE OTHER METHODS FOR NEUTRALIZATION | $11,000 | $50,000 | Implemented |
OK0519 # 07 Y:1997 | 07 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $467 | $880 | Implemented |
OK0519 # 08 Y:1997 | 08 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $115 | $644 | Implemented |