IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0127 # 02 Y:2014 02 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,800 $2,100 Not Implemented
DL0127 # 01 Y:2014 01 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,800 $100 Implemented
DL0127 # 12 Y:2014 12 2014 INSTALL OCCUPANCY SENSORS $3,400 $2,300 Implemented
DL0127 # 11 Y:2014 11 2014 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $7,900 $5,200 Not Implemented
DL0127 # 10 Y:2014 10 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,900 $3,200 Not Implemented
DL0127 # 09 Y:2014 09 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,800 $250 Implemented
DL0127 # 08 Y:2014 08 2014 RECOVER WASTE HEAT FROM EQUIPMENT $8,900 $13,000 Not Implemented
DL0127 # 07 Y:2014 07 2014 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $15,300 $5,700 Not Implemented
DL0127 # 06 Y:2014 06 2014 RECOVER WASTE HEAT FROM EQUIPMENT $28,400 $2,100 Not Implemented
DL0127 # 05 Y:2014 05 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $14,000 $50 Not Implemented
DL0127 # 04 Y:2014 04 2014 REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS $1,200 $1,800 Not Implemented
DL0127 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,300 $100 Not Implemented
LE0357 # 03 Y:2013 03 2013 INSTALL TIMERS AND/OR THERMOSTATS $992 $225 Implemented
LE0357 # 02 Y:2013 02 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $41,310 $87,100 Implemented
LE0357 # 01 Y:2013 01 2013 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $990,391 $2,480,000 Not Implemented
LE0357 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $143,805 $5,420 Not Implemented
LE0357 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $29,839 $0 Implemented
LE0357 # 09 Y:2013 09 2013 OPTIMIZE PLANT POWER FACTOR $20,522 $42,000 Implemented
LE0357 # 10 Y:2013 10 2013 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $38 $110 Implemented
LE0357 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,062 $3,910 Implemented
LE0357 # 07 Y:2013 07 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,733 $11,400 Not Implemented
LE0357 # 08 Y:2013 08 2013 REPAIR AND ELIMINATE STEAM LEAKS $1,285 $4,500 Implemented
HO0155 # 07 Y:1997 07 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,263 $1,363 Implemented
HO0155 # 08 Y:1997 08 1997 INSTALL AUTOMATIC PACKING EQUIPMENT $5,460 $25,000 Implemented
HO0155 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,489 $1,607 Implemented