IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,930

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0549 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,119 $19,959 Not Implemented
SF0549 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $403 $1,776 Implemented
SF0549 # 07 Y:2020 07 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $67,154 $343,660 Not Implemented
SF0549 # 08 Y:2020 08 2020 USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING $22,925 $1,810 Implemented
SF0549 # 09 Y:2020 09 2020 REDUCE WATER USE WITH COUNTER CURRENT RINSING $44,084 $48,094 Not Implemented
UD1010 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,598 $500 Implemented
UD1010 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $299 $0 Implemented
UD1010 # 03 Y:2020 03 2020 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $7,123 $5,000 Not Implemented
UD1010 # 04 Y:2020 04 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $21,830 $20,000 Not Implemented
UD1010 # 05 Y:2020 05 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,001 $60,000 Implemented
UD1010 # 06 Y:2020 06 2020 REPAIR OR REPLACE STEAM TRAPS $483 $5,500 Implemented
UD1010 # 07 Y:2020 07 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,616 $7,457 Not Implemented
UD1010 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,704 $10,753 Not Implemented
UD1010 # 09 Y:2020 09 2020 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,565 $0 Not Implemented
UD1010 # 10 Y:2020 10 2020 REDESIGN PROCESS $3,722 $43,500 Implemented
UF0539 # 01 Y:2019 01 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $38,262 $166,880 Implemented
UF0539 # 02 Y:2019 02 2019 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $6,161 $518 Implemented
UF0539 # 03 Y:2019 03 2019 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,651 $11,760 Not Implemented
UF0539 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,250 $11,853 Implemented
UF0539 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $1,002 $3,662 Implemented
UF0539 # 06 Y:2019 06 2019 INSTALL AN UNINTERUPTABLE POWER SUPPLY $44,758 $3,326 Not Implemented
LS1915 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $310 $33 Not Implemented
LS1915 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $99 $25 Not Implemented
LS1915 # 03 Y:2019 03 2019 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $607 $450 Not Implemented
LS1915 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,228 $1,974 Implemented