Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,930

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0151 # 01 Y:2015 01 2015 USE CORRECT SIZE STEAM TRAPS $12,870 $2,380 Not Implemented
DL0151 # 02 Y:2015 02 2015 MINIMIZE OVERFLOWS BY INSTALLING LEVEL CONTROLS $37,680 $12,400 Not Implemented
DL0151 # 03 Y:2015 03 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $60,250 $20,000 Not Implemented
DL0151 # 04 Y:2015 04 2015 OPERATE BOILERS ON HIGH FIRE SETTING $10,860 $4,610 Not Implemented
DL0151 # 05 Y:2015 05 2015 UPGRADE CONTROLS ON COMPRESSORS $7,730 $11,520 Not Implemented
DL0151 # 06 Y:2015 06 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,550 $14,400 Not Implemented
DL0151 # 07 Y:2015 07 2015 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $1,970 $4,480 Not Implemented
DL0151 # 08 Y:2015 08 2015 MINIMIZE WATER USAGE $80,640 $200,250 Not Implemented
OR0655 # 01 Y:2015 01 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $26,151 $0 Not Implemented
OR0655 # 02 Y:2015 02 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,161 $1,000 Implemented
OR0655 # 03 Y:2015 03 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $20,211 $1,000 Not Implemented
OR0655 # 04 Y:2015 04 2015 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $175,008 $188,400 Not Implemented
OR0655 # 05 Y:2015 05 2015 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $15,571 $19,050 Not Implemented
OR0655 # 06 Y:2015 06 2015 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $180,695 $251,760 Not Implemented
OR0655 # 07 Y:2015 07 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $51,916 $126,000 Not Implemented
OR0655 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $4,958 $7,816 Not Implemented
OR0655 # 09 Y:2015 09 2015 USE SOLAR HEAT TO MAKE ELECTRICTY $2,480 $20,979 Not Implemented
OR0653 # 01 Y:2015 01 2015 INCREASE AMOUNT OF CONDENSATE RETURNED $118,419 $40,792 Not Implemented
OR0653 # 02 Y:2015 02 2015 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $36,536 $30,728 Not Implemented
OR0653 # 03 Y:2015 03 2015 USE OPTIMUM THICKNESS INSULATION $3,897 $4,580 Not Implemented
OR0653 # 04 Y:2015 04 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $611 $1,058 Not Implemented
OR0653 # 05 Y:2015 05 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,262 $15,398 Not Implemented
OR0653 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,625 $1,000 Not Implemented
TT0160 # 01 Y:2015 01 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $112,350 $2,000 Not Implemented
TT0160 # 02 Y:2015 02 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,461 $298 Implemented