IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

111

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0508 # 04 Y:2006 04 2006 BURN A LESS EXPENSIVE GRADE OF FUEL $375,000 $480,000 Not Implemented
OR0508 # 05 Y:2006 05 2006 OPTIMIZE PLANT POWER FACTOR $18,300 $31,500 Not Implemented
OR0508 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,200 $3,200 Implemented
OR0508 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,100 $12,000 Implemented
OR0508 # 08 Y:2006 08 2006 UPGRADE CONTROLS ON COMPRESSORS $5,100 $30,000 Implemented
OR0508 # 09 Y:2006 09 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,700 $6,900 Not Implemented
OR0491 # 01 Y:2005 01 2005 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $22,340 $0 Not Implemented
OR0491 # 02 Y:2005 02 2005 MODIFY MATERIAL APPLICATION METHODS $17,000 $7,200 Not Implemented
OR0491 # 03 Y:2005 03 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $14,000 $7,200 Not Implemented
OR0491 # 04 Y:2005 04 2005 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,180 $1,000 Not Implemented
OR0491 # 05 Y:2005 05 2005 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $730 $1,300 Not Implemented
OR0491 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $2,440 $1,900 Not Implemented
OR0491 # 07 Y:2005 07 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,040 $10,650 Not Implemented
OR0491 # 08 Y:2005 08 2005 OPTIMIZE PLANT POWER FACTOR $650 $1,800 Not Implemented
OR0478 # 01 Y:2005 01 2005 OPTIMIZE PLANT POWER FACTOR $11,420 $6,400 Implemented
OR0478 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,500 $1,900 Implemented
OR0478 # 03 Y:2005 03 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,700 $49,100 Implemented
OR0478 # 04 Y:2005 04 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,800 $0 Not Implemented
OR0422 # 01 Y:2002 01 2002 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,067 $0 Implemented
OR0422 # 02 Y:2002 02 2002 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $4,106 $2,000 Implemented
OR0422 # 03 Y:2002 03 2002 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $6,975 $5,500 Implemented
OR0422 # 04 Y:2002 04 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,944 $2,953 Implemented
OR0422 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $595 $0 Implemented
OR0272 # 01 Y:1996 01 1996 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $11,768 $11,600 Not Implemented
OR0272 # 02 Y:1996 02 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $247,053 $1,000,000 Implemented