IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

111

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0272 # 03 Y:1996 03 1996 KEEP BOILER TUBES CLEAN $1,014 $1,000 Not Implemented
OR0272 # 04 Y:1996 04 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $923 $2,220 Implemented
OR0272 # 05 Y:1996 05 1996 INSTALL SET-BACK TIMERS $11,080 $105,000 Not Implemented
OR0271 # 01 Y:1996 01 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $9,100 $0 Not Implemented
OR0271 # 02 Y:1996 02 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $22,000 $5,000 Implemented
OR0271 # 03 Y:1996 03 1996 REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS $10,070 $6,000 Not Implemented
OR0271 # 04 Y:1996 04 1996 KEEP BOILER TUBES CLEAN $330 $500 Not Implemented
OR0271 # 05 Y:1996 05 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,740 $16,120 Implemented
OR0271 # 06 Y:1996 06 1996 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $160 $0 Not Implemented
OR0271 # 07 Y:1996 07 1996 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $5,480 $3,000 Implemented
OR0235 # 01 Y:1995 01 1995 ADD AREA LIGHTING SWITCHES $2,089 $2,200 Implemented
OR0235 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,052 $2,592 Implemented
OR0235 # 03 Y:1995 03 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $250 $500 Implemented
OR0235 # 04 Y:1995 04 1995 RECOVER WASTE HEAT FROM EQUIPMENT $1,680 $4,000 Implemented
OR0235 # 05 Y:1995 05 1995 USE MULTIPLE-EFFECT EVAPORATORS $2,900 $9,500 Implemented
OR0235 # 06 Y:1995 06 1995 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,970 $8,500 Not Implemented
OR0193 # 01 Y:1993 01 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $29,170 $5,000 Implemented
OR0193 # 02 Y:1993 02 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,796 $0 Implemented
OR0193 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,033 $7,596 Not Implemented
OR0193 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $158 $425 Implemented
OR0193 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $893 $4,913 Not Implemented
OR0193 # 06 Y:1993 06 1993 OPTIMIZE PLANT POWER FACTOR $2,954 $9,000 Not Implemented
OR0193 # 07 Y:1993 07 1993 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,806 $1,000 Implemented
OR0193 # 08 Y:1993 08 1993 AIR CONDITION ONLY SPACE NECESSARY $6,042 $6,116 Implemented
OR0193 # 09 Y:1993 09 1993 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $18,099 $39,000 Implemented