IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,945

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0374 # 13 Y:2009 13 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,217 $4,719 Implemented
SF0374 # 14 Y:2009 14 2009 INSTALL OCCUPANCY SENSORS $701 $1,567 Implemented
SF0374 # 15 Y:2009 15 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,809 $31,988 Not Implemented
SF0374 # 16 Y:2009 16 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,002 $318 Implemented
SF0374 # 17 Y:2009 17 2009 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $89,029 $326,072 Implemented
SF0374 # 18 Y:2009 18 2009 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $16,622 $86,476 Implemented
SF0374 # 19 Y:2009 19 2009 RECOVER AND REUSE COOLING WATER $23,524 $15,018 Not Implemented
UF0400 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,632 $9,727 Implemented
UF0400 # 02 Y:2007 02 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,731 $0 Not Implemented
UF0400 # 03 Y:2007 03 2007 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,930 $624 Implemented
UF0400 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $4,182 $928 Implemented
UF0400 # 05 Y:2007 05 2007 KEEP EQUIPMENT CLEAN $3,059 $87 Implemented
UF0400 # 06 Y:2007 06 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,583 $21,927 Not Implemented
UF0400 # 07 Y:2007 07 2007 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $653 $511 Not Implemented
UF0400 # 08 Y:2007 08 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $111,825 $230 Not Implemented
OK0746 # 01 Y:2007 01 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $32,026 $30,757 Implemented
OK0746 # 02 Y:2007 02 2007 USE SOLAR HEAT FOR HEAT $26,050 $140,000 Not Implemented
OK0746 # 03 Y:2007 03 2007 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $52,302 $14,800 Not Implemented
OK0746 # 04 Y:2007 04 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,580 $4,541 Implemented
OK0746 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,287 $3,000 Implemented
OK0746 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,881 $3,256 Implemented
OK0746 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,881 $0 Implemented
OK0746 # 08 Y:2007 08 2007 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $39,725 $63,500 Not Implemented
OK0746 # 09 Y:2007 09 2007 OPERATE BOILERS ON HIGH FIRE SETTING $49,382 $46,200 Not Implemented
OK0746 # 10 Y:2007 10 2007 OPERATE BOILERS ON HIGH FIRE SETTING $40,383 $400 Not Implemented