Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,930
matching recommendationsSIC | 203 | Preserved Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TR0044 # 03 Y:2022 | 03 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $109,638 | $1,599,426 | Not Implemented |
TR0044 # 04 Y:2022 | 04 | 2022 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $8,106 | $2,500 | Implemented |
LT8369 # 03 Y:2022 | 03 | 2022 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $4,568 | $3,852 | n/a |
LT8369 # 02 Y:2022 | 02 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $14,592 | $12,831 | n/a |
LT8369 # 01 Y:2022 | 01 | 2022 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $12,717 | $30,030 | n/a |
SF0591 # 11 Y:2022 | 11 | 2022 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $35,700 | $132,000 | Not Implemented |
SF0591 # 10 Y:2022 | 10 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $47,418 | $177,700 | Not Implemented |
SF0591 # 09 Y:2022 | 09 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,521 | $18,051 | Implemented |
SF0591 # 08 Y:2022 | 08 | 2022 | INSULATE FEEDWATER TANK | $1,806 | $4,445 | Not Implemented |
SF0591 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,540 | $14,724 | Implemented |
SF0591 # 06 Y:2022 | 06 | 2022 | INSTALL SET-BACK TIMERS | $22,648 | $6,467 | Implemented |
SF0591 # 05 Y:2022 | 05 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $814 | $268 | Not Implemented |
SF0591 # 04 Y:2022 | 04 | 2022 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $6,698 | $0 | Implemented |
SF0591 # 03 Y:2022 | 03 | 2022 | REDUCE EXCESS STEAM BLEEDING | $9,616 | $0 | Implemented |
SF0591 # 02 Y:2022 | 02 | 2022 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $9,922 | $0 | Implemented |
SF0591 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,537 | $0 | Not Implemented |
OR0757 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,612 | $0 | Not Implemented |
OR0757 # 02 Y:2022 | 02 | 2022 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $26,900 | $0 | Not Implemented |
OR0757 # 03 Y:2022 | 03 | 2022 | INSTALL AUTOMATIC PACKING EQUIPMENT | $97,200 | $50,000 | Not Implemented |
OR0757 # 04 Y:2022 | 04 | 2022 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $194,400 | $300,000 | Not Implemented |
NL0066 # 01 Y:2022 | 01 | 2022 | USE AUTOMATIC CLEANING EQUIPMENT | $250,000 | $215,120 | Implemented |
NL0066 # 02 Y:2022 | 02 | 2022 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $250,000 | $150,000 | Not Implemented |
NL0066 # 03 Y:2022 | 03 | 2022 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $49,500 | $95,000 | Implemented |
NL0066 # 04 Y:2022 | 04 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $16,645 | $32,028 | Implemented |
NL0066 # 05 Y:2022 | 05 | 2022 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $11,640 | $13,920 | Implemented |