Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,930
matching recommendationsSIC | 203 | Preserved Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LM0050 # 14 Y:2003 | 14 | 2003 | USE ONLY AMOUNT OF PACKAGING MATERIAL NECESSARY | $101,616 | $150,000 | Not Implemented |
WV0256 # 05 Y:2003 | 05 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $541 | $50 | Implemented |
WV0256 # 06 Y:2003 | 06 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $412 | $310 | Not Implemented |
WV0256 # 07 Y:2003 | 07 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $267 | $750 | Implemented |
WV0256 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $255 | $0 | Implemented |
WV0256 # 09 Y:2003 | 09 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $752 | $40 | Implemented |
WV0256 # 10 Y:2003 | 10 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $1,043 | $1,000 | Implemented |
WV0256 # 01 Y:2003 | 01 | 2003 | INSULATE BARE EQUIPMENT | $969 | $1,023 | Implemented |
WV0256 # 02 Y:2003 | 02 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,359 | $400 | Implemented |
WV0256 # 03 Y:2003 | 03 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $82 | $1,000 | Implemented |
WV0256 # 04 Y:2003 | 04 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $170 | $1,730 | Not Implemented |
SU0148 # 01 Y:2002 | 01 | 2002 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $163,907 | $767,895 | Not Implemented |
SU0148 # 02 Y:2002 | 02 | 2002 | ADJUST BURNERS FOR EFFICIENT OPERATION | $25,533 | $0 | Implemented |
SU0148 # 03 Y:2002 | 03 | 2002 | MODIFY WORKLOAD | $14,400 | $20,000 | Implemented |
SU0148 # 04 Y:2002 | 04 | 2002 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $31,584 | $17,490 | Implemented |
SU0148 # 05 Y:2002 | 05 | 2002 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $9,006 | $3,700 | Implemented |
SU0148 # 06 Y:2002 | 06 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,438 | $320 | Not Implemented |
SU0148 # 07 Y:2002 | 07 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $105 | $0 | Implemented |
SU0148 # 08 Y:2002 | 08 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $70 | $60 | Implemented |
OR0422 # 01 Y:2002 | 01 | 2002 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,067 | $0 | Implemented |
OR0422 # 02 Y:2002 | 02 | 2002 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $4,106 | $2,000 | Implemented |
OR0422 # 03 Y:2002 | 03 | 2002 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $6,975 | $5,500 | Implemented |
OR0422 # 04 Y:2002 | 04 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,944 | $2,953 | Implemented |
OR0422 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $595 | $0 | Implemented |
SF0244 # 01 Y:2002 | 01 | 2002 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $31,136 | $7,960 | Not Implemented |