IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,930

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0244 # 02 Y:2002 02 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $107,810 $50,000 Implemented
SF0244 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $36,936 $19,350 Not Implemented
SF0244 # 04 Y:2002 04 2002 REDUCE FLUID FLOW RATES $31,494 $16,627 Implemented
SF0244 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $2,185 $1,200 Not Implemented
SF0244 # 06 Y:2002 06 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,304 $4,110 Implemented
SF0244 # 07 Y:2002 07 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $21,274 $17,580 Implemented
SF0244 # 08 Y:2002 08 2002 REDUCE EXCESSIVE BOILER BLOWDOWN $6,671 $6,000 Implemented
SF0244 # 09 Y:2002 09 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,672 $2,500 Not Implemented
SF0244 # 10 Y:2002 10 2002 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $319 $393 Not Implemented
SF0244 # 11 Y:2002 11 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,487 $14,055 Not Implemented
SF0244 # 12 Y:2002 12 2002 TREAT AND REUSE RINSE WATERS $218,183 $18,705 n/a
SF0244 # 13 Y:2002 13 2002 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $8,739 $0 Not Implemented
SF0244 # 14 Y:2002 14 2002 OPTIMIZE PLANT POWER FACTOR $2,389 $3,651 Not Implemented
SF0244 # 15 Y:2002 15 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $72,375 $160,000 Not Implemented
SF0244 # 16 Y:2002 16 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $101,519 $350,000 Implemented
AS0330 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,018 $3,240 Not Implemented
AS0330 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $948 $3,673 Not Implemented
AS0330 # 03 Y:2002 03 2002 INSTALL SKYLIGHTS $1,360 $5,352 Not Implemented
AS0330 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $230 $975 Not Implemented
AS0330 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $256 $60 Not Implemented
AS0330 # 06 Y:2002 06 2002 REUSE / RECYCLE/ SELL PAPER PRODUCTS $832 $60 Not Implemented
AS0330 # 07 Y:2002 07 2002 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING $259 $65 Not Implemented
AS0330 # 08 Y:2002 08 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $23,186 $8,988 Not Implemented
LL0139 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,787 $435 Implemented
LL0139 # 02 Y:2002 02 2002 OPTIMIZE PLANT POWER FACTOR $2,835 $3,325 Not Implemented