IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,877

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0179 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,013 $6,614 Implemented
UU0179 # 07 Y:2021 07 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $617 $50 Not Implemented
UU0179 # 08 Y:2021 08 2021 INSULATE BARE EQUIPMENT $345 $747 Not Implemented
BS0142 # 01 Y:2020 01 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,675 $335 Not Implemented
BS0142 # 02 Y:2020 02 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,550 $6,370 Not Implemented
BS0142 # 03 Y:2020 03 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,266 $1,811 Not Implemented
BS0142 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $53 $75 Not Implemented
BS0142 # 05 Y:2020 05 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $888 $1,944 Not Implemented
SF0554 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $427 $80 Implemented
SF0554 # 02 Y:2020 02 2020 USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS $21,879 $20,311 Not Implemented
SF0554 # 03 Y:2020 03 2020 INSULATE BARE EQUIPMENT $386 $404 Not Implemented
SF0554 # 04 Y:2020 04 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,802 $5,638 Not Implemented
SF0554 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,099 $13,511 Implemented
SF0554 # 06 Y:2020 06 2020 INSULATE BARE EQUIPMENT $1,140 $1,577 Not Implemented
SF0554 # 07 Y:2020 07 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $871 $1,184 Implemented
SF0554 # 08 Y:2020 08 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $833 $1,245 Not Implemented
SF0554 # 09 Y:2020 09 2020 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $632 $1,312 Implemented
SF0554 # 10 Y:2020 10 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,351 $5,888 Implemented
SF0549 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,719 $0 Implemented
SF0549 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,182 $120 Not Implemented
SF0549 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,204 $25,635 Implemented
SF0549 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $475 $1,214 Implemented
SF0549 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,119 $19,959 Not Implemented
SF0549 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $403 $1,776 Implemented
SF0549 # 07 Y:2020 07 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $67,154 $343,660 Not Implemented