Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20
matching recommendationsSIC | 203 | Preserved Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0746 # 03 Y:2007 | 03 | 2007 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $52,302 | $14,800 | Not Implemented |
OK0746 # 12 Y:2007 | 12 | 2007 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,000 | $840,000 | Not Implemented |
OK0746 # 11 Y:2007 | 11 | 2007 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $30,387 | $15,000 | Not Implemented |
OK0746 # 10 Y:2007 | 10 | 2007 | OPERATE BOILERS ON HIGH FIRE SETTING | $40,383 | $400 | Not Implemented |
OK0746 # 09 Y:2007 | 09 | 2007 | OPERATE BOILERS ON HIGH FIRE SETTING | $49,382 | $46,200 | Not Implemented |
OK0746 # 08 Y:2007 | 08 | 2007 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $39,725 | $63,500 | Not Implemented |
OK0746 # 07 Y:2007 | 07 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,881 | $0 | Implemented |
OK0746 # 06 Y:2007 | 06 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,881 | $3,256 | Implemented |
OK0746 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,287 | $3,000 | Implemented |
OK0746 # 04 Y:2007 | 04 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,580 | $4,541 | Implemented |
OK0746 # 02 Y:2007 | 02 | 2007 | USE SOLAR HEAT FOR HEAT | $26,050 | $140,000 | Not Implemented |
OK0746 # 01 Y:2007 | 01 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $32,026 | $30,757 | Implemented |
OK0519 # 01 Y:1997 | 01 | 1997 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $178,301 | $18,000 | Implemented |
OK0519 # 08 Y:1997 | 08 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $115 | $644 | Implemented |
OK0519 # 07 Y:1997 | 07 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $467 | $880 | Implemented |
OK0519 # 06 Y:1997 | 06 | 1997 | USE OTHER METHODS FOR NEUTRALIZATION | $11,000 | $50,000 | Implemented |
OK0519 # 05 Y:1997 | 05 | 1997 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $0 | $119,800 | Not Implemented |
OK0519 # 04 Y:1997 | 04 | 1997 | USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) | $14,177 | $20,000 | Implemented |
OK0519 # 03 Y:1997 | 03 | 1997 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,927 | $0 | Implemented |
OK0519 # 02 Y:1997 | 02 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,853 | $15,000 | Implemented |