Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsSIC | 203 | Preserved Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0244 # 14 Y:2002 | 14 | 2002 | OPTIMIZE PLANT POWER FACTOR | $2,389 | $3,651 | Not Implemented |
SF0244 # 09 Y:2002 | 09 | 2002 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $2,672 | $2,500 | Not Implemented |
SF0244 # 08 Y:2002 | 08 | 2002 | REDUCE EXCESSIVE BOILER BLOWDOWN | $6,671 | $6,000 | Implemented |
SF0244 # 07 Y:2002 | 07 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $21,274 | $17,580 | Implemented |
SF0244 # 06 Y:2002 | 06 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,304 | $4,110 | Implemented |
SF0244 # 05 Y:2002 | 05 | 2002 | INSTALL OCCUPANCY SENSORS | $2,185 | $1,200 | Not Implemented |
SF0244 # 04 Y:2002 | 04 | 2002 | REDUCE FLUID FLOW RATES | $31,494 | $16,627 | Implemented |
SF0244 # 03 Y:2002 | 03 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $36,936 | $19,350 | Not Implemented |
SF0244 # 02 Y:2002 | 02 | 2002 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $107,810 | $50,000 | Implemented |
SF0244 # 01 Y:2002 | 01 | 2002 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $31,136 | $7,960 | Not Implemented |
SF0244 # 15 Y:2002 | 15 | 2002 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $72,375 | $160,000 | Not Implemented |
SF0244 # 16 Y:2002 | 16 | 2002 | $101,519 | $350,000 | Implemented | |
SF0244 # 10 Y:2002 | 10 | 2002 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $319 | $393 | Not Implemented |
SF0244 # 11 Y:2002 | 11 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,487 | $14,055 | Not Implemented |
SF0244 # 13 Y:2002 | 13 | 2002 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $8,739 | $0 | Not Implemented |
SF0244 # 12 Y:2002 | 12 | 2002 | TREAT AND REUSE RINSE WATERS | $218,183 | $18,705 | n/a |
LM0036 # 07 Y:2002 | 07 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $24,505 | $21,928 | Not Implemented |
LM0036 # 08 Y:2002 | 08 | 2002 | $101,250 | $15,800 | Implemented | |
LM0036 # 09 Y:2002 | 09 | 2002 | $145,152 | $2,000 | Not Implemented | |
LM0036 # 10 Y:2002 | 10 | 2002 | $202,078 | $453,275 | Not Implemented | |
LM0036 # 11 Y:2002 | 11 | 2002 | $199,710 | $14,000 | Implemented | |
LM0036 # 06 Y:2002 | 06 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,928 | $23,600 | Not Implemented |
LM0036 # 05 Y:2002 | 05 | 2002 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $21,342 | $4,800 | Implemented |
LM0036 # 04 Y:2002 | 04 | 2002 | UPGRADE CONTROLS ON COMPRESSORS | $19,570 | $300 | Not Implemented |
LM0036 # 02 Y:2002 | 02 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,227 | $1,335 | Implemented |