IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0313 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,950 $500 Implemented
MZ0313 # 01 Y:2021 01 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,725 $240 Implemented
MZ0313 # 02 Y:2021 02 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $34,967 $33,446 Implemented
KU0456 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,121 $6,407 Implemented
KU0456 # 05 Y:1995 05 1995 INCREASE AMOUNT OF CONDENSATE RETURNED $150 $450 Implemented
KU0456 # 02 Y:1995 02 1995 INSTALL OCCUPANCY SENSORS $926 $900 Implemented
KU0456 # 03 Y:1995 03 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $292 $408 Implemented
KU0456 # 06 Y:1995 06 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,740 $3,500 Implemented
KU0456 # 04 Y:1995 04 1995 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $138 $217 Implemented
KU0396 # 09 Y:1993 09 1993 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $252 $0 Implemented
KU0396 # 08 Y:1993 08 1993 RECOVER WASTE HEAT FROM EQUIPMENT $422 $668 Not Implemented
KU0396 # 07 Y:1993 07 1993 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,065 $216 Implemented
KU0396 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,545 $1,172 Not Implemented
KU0396 # 04 Y:1993 04 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,274 $10,000 Not Implemented
KU0396 # 03 Y:1993 03 1993 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,811 $10,000 Not Implemented
KU0396 # 02 Y:1993 02 1993 USE STEAM SPARGING OR INJECTIONS IN PLACE OF INDIRECT HEATING $6,812 $6,925 Implemented
KU0396 # 01 Y:1993 01 1993 RECOVER WASTE HEAT FROM EQUIPMENT $15,571 $21,400 Not Implemented
KU0393 # 08 Y:1993 08 1993 INSTALL TIMERS AND/OR THERMOSTATS $123 $235 Not Implemented
KU0393 # 07 Y:1993 07 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $316 $60 Not Implemented
KU0393 # 06 Y:1993 06 1993 INSTALL OCCUPANCY SENSORS $344 $800 Not Implemented
KU0393 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $574 $1,800 Not Implemented
KU0393 # 04 Y:1993 04 1993 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,913 $14,300 Not Implemented
KU0393 # 03 Y:1993 03 1993 OPTIMIZE PLANT POWER FACTOR $4,164 $11,320 Implemented
KU0393 # 02 Y:1993 02 1993 USE STEAM SPARGING OR INJECTIONS IN PLACE OF INDIRECT HEATING $5,295 $6,925 Not Implemented
KU0393 # 01 Y:1993 01 1993 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $14,813 $23,600 Not Implemented