Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
61
matching recommendationsSIC | 203 | Preserved Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0358 # 07 Y:2004 | 07 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $633 | $633 | Implemented |
IA0358 # 12 Y:2004 | 12 | 2004 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $3,166 | $40 | Implemented |
IA0358 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,955 | $3,368 | Implemented |
IA0358 # 10 Y:2004 | 10 | 2004 | INSTALL OCCUPANCY SENSORS | $414 | $924 | Not Implemented |
IA0358 # 09 Y:2004 | 09 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $930 | $2,030 | Not Implemented |
IA0358 # 05 Y:2004 | 05 | 2004 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $3,523 | $1,800 | Not Implemented |
IA0358 # 06 Y:2004 | 06 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,052 | $609 | Not Implemented |
IA0358 # 11 Y:2004 | 11 | 2004 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $1,223 | $100 | Implemented |
IA0358 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,528 | $359 | Implemented |
IA0358 # 02 Y:2004 | 02 | 2004 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $36,969 | $18,000 | Implemented |
IA0358 # 03 Y:2004 | 03 | 2004 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $2,577 | $1,000 | Implemented |
IA0358 # 01 Y:2004 | 01 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $24,532 | $1,000 | Implemented |
IA0355 # 09 Y:2004 | 09 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,817 | $1 | Not Implemented |
IA0355 # 10 Y:2004 | 10 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,274 | $3,116 | Not Implemented |
IA0355 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $956 | $230 | Implemented |
IA0355 # 06 Y:2004 | 06 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $540 | $359 | Implemented |
IA0355 # 08 Y:2004 | 08 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,227 | $3 | Not Implemented |
IA0355 # 11 Y:2004 | 11 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,521 | $2 | Implemented |
IA0355 # 02 Y:2004 | 02 | 2004 | USE MINIMUM STEAM OPERATING PRESSURE | $965 | $25 | Not Implemented |
IA0355 # 04 Y:2004 | 04 | 2004 | REDUCE EXCESSIVE BOILER BLOWDOWN | $8,646 | $2 | Implemented |
IA0355 # 05 Y:2004 | 05 | 2004 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $9,161 | $3 | Implemented |
IA0355 # 03 Y:2004 | 03 | 2004 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $12,422 | $17 | Implemented |
IA0355 # 01 Y:2004 | 01 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,113 | $300 | Implemented |
IA0355 # 12 Y:2004 | 12 | 2004 | INSTALL OCCUPANCY SENSORS | $334 | $616 | Not Implemented |
IA0355 # 13 Y:2004 | 13 | 2004 | ADD AREA LIGHTING SWITCHES | $1,045 | $689 | Not Implemented |