IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0528 # 08 Y:2014 08 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $288 $70 Not Implemented
IA0528 # 07 Y:2014 07 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $408 $970 Not Implemented
IA0528 # 06 Y:2014 06 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $1,974 $1,053 Not Implemented
IA0528 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $453 $525 Not Implemented
IA0528 # 04 Y:2014 04 2014 USE PHOTOCELL CONTROLS $2,865 $630 Not Implemented
IA0528 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,031 $10,568 Not Implemented
IA0528 # 02 Y:2014 02 2014 INSULATE BARE EQUIPMENT $9,196 $7,095 Not Implemented
IA0528 # 01 Y:2014 01 2014 HEAT WATER WITH EXHAUST HEAT $14,601 $9,600 Not Implemented
IA0462 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,704 $16,590 Not Implemented
IA0462 # 09 Y:2011 09 2011 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,450 $1,000 Not Implemented
IA0462 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,158 $15,702 Not Implemented
IA0462 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $2,818 $1,530 Not Implemented
IA0462 # 04 Y:2011 04 2011 UTILIZE A LESS EXPENSIVE COOLING METHOD $59,656 $20,000 Not Implemented
IA0462 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $15,983 $25,000 Not Implemented
IA0462 # 06 Y:2011 06 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,698 $240 Not Implemented
IA0462 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,593 $250 Not Implemented
IA0462 # 08 Y:2011 08 2011 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $22,774 $1,500 Not Implemented
IA0462 # 10 Y:2011 10 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,518 $200 Not Implemented
IC0110 # 01 Y:2005 01 2005 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $106,617 $213,420 Implemented
IC0110 # 02 Y:2005 02 2005 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM $79,621 $634,572 Not Implemented
IC0110 # 03 Y:2005 03 2005 REPAIR OR REPLACE STEAM TRAPS $29,831 $1,638 Implemented
IC0110 # 04 Y:2005 04 2005 REPAIR AND ELIMINATE STEAM LEAKS $6,051 $400 Implemented
IC0110 # 05 Y:2005 05 2005 IMPROVE COMBUSTION CONTROL CAPABILITY $13,789 $3,500 Implemented
IC0110 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,956 $0 Implemented
IC0110 # 07 Y:2005 07 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $7,443 $15,000 Not Implemented