IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

268

matching recommendations
Reset
SIC 2032 Canned Specialties
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0463 # 03 Y:1992 03 1992 KEEP LAMPS AND REFLECTORS CLEAN $4,189 $9,322 Not Implemented
TN0463 # 04 Y:1992 04 1992 REPAIR AND ELIMINATE STEAM LEAKS $874 $190 Not Implemented
AS0053 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,641 $31,121 Not Implemented
AS0053 # 02 Y:1992 02 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,207 $0 Not Implemented
AS0053 # 03 Y:1992 03 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,961 $7,628 Not Implemented
AS0053 # 04 Y:1992 04 1992 INSULATE BARE EQUIPMENT $12,327 $5,772 Implemented
AS0053 # 05 Y:1992 05 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $2,693 $989 Implemented
AS0053 # 06 Y:1992 06 1992 REPAIR AND ELIMINATE STEAM LEAKS $61,904 $27,000 Implemented
AS0053 # 07 Y:1992 07 1992 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $68,532 $7,500 Not Implemented
AS0053 # 08 Y:1992 08 1992 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $-39,218 $800,000 Not Implemented
AS0053 # 09 Y:1992 09 1992 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $202 $420 Not Implemented
AS0053 # 10 Y:1992 10 1992 USE HEAT PUMP FOR SPACE CONDITIONING $3,520 $12,000 Not Implemented
AS0053 # 11 Y:1992 11 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $877 $7,308 Not Implemented
AS0053 # 12 Y:1992 12 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,687 $3,584 Not Implemented
AS0053 # 13 Y:1992 13 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,333 $400 Implemented
AS0053 # 14 Y:1992 14 1992 IMPROVE LUBRICATION PRACTICES $1,257 $1,092 Not Implemented
IA0005 # 01 Y:1991 01 1991 HEAT WATER WITH EXHAUST HEAT $10,300 $25,000 Not Implemented
IA0005 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,463 $9,202 Not Implemented
IA0005 # 03 Y:1991 03 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,471 $0 Not Implemented
IA0005 # 04 Y:1991 04 1991 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $24,575 $13,000 Not Implemented
IA0005 # 05 Y:1991 05 1991 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,435 $5,300 Not Implemented
CO0213 # 01 Y:1991 01 1991 RECOVER AND REUSE COOLING WATER $52,663 $0 Not Implemented
CO0213 # 02 Y:1991 02 1991 INCREASE AMOUNT OF CONDENSATE RETURNED $6,000 $0 Not Implemented
CO0213 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,900 $900 Not Implemented
CO0213 # 04 Y:1991 04 1991 INSTALL TIMERS AND/OR THERMOSTATS $1,600 $700 Not Implemented