Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
39
matching recommendationsSIC | 2033 | Canned Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TR0002 # 06 Y:2017 | 06 | 2017 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,204 | $0 | Implemented |
TR0002 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $187 | $55 | Implemented |
TR0002 # 02 Y:2017 | 02 | 2017 | USE OPTIMUM THICKNESS INSULATION | $6,968 | $500 | Implemented |
TR0002 # 03 Y:2017 | 03 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $9,895 | $10,000 | Not Implemented |
TR0002 # 05 Y:2017 | 05 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,329 | $60 | Implemented |
TR0002 # 01 Y:2017 | 01 | 2017 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $30,725 | $22,000 | Implemented |
AM0705 # 07 Y:2016 | 07 | 2016 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $760 | $0 | Not Implemented |
AM0705 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $990 | $1,360 | Implemented |
AM0705 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,205 | $685 | Implemented |
AM0705 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,420 | $600 | Implemented |
AM0705 # 03 Y:2016 | 03 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,405 | $90 | Implemented |
AM0705 # 02 Y:2016 | 02 | 2016 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $1,905 | $0 | Not Implemented |
AM0705 # 01 Y:2016 | 01 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,470 | $5,000 | Implemented |
AM0705 # 08 Y:2016 | 08 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $540 | $7 | Implemented |
AM0620 # 06 Y:2012 | 06 | 2012 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,965 | $240 | Implemented |
AM0620 # 07 Y:2012 | 07 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,505 | $750 | Not Implemented |
AM0620 # 08 Y:2012 | 08 | 2012 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,390 | $0 | Implemented |
AM0620 # 09 Y:2012 | 09 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,270 | $3,290 | Implemented |
AM0620 # 10 Y:2012 | 10 | 2012 | INSULATE BARE EQUIPMENT | $1,030 | $1,650 | Implemented |
AM0620 # 11 Y:2012 | 11 | 2012 | USE SYNTHETIC LUBRICANT | $515 | $0 | Not Implemented |
AM0620 # 05 Y:2012 | 05 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,245 | $54 | Not Implemented |
AM0620 # 04 Y:2012 | 04 | 2012 | REPLACE BOILER | $5,730 | $30,000 | Implemented |
AM0620 # 03 Y:2012 | 03 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,660 | $120 | Implemented |
AM0620 # 02 Y:2012 | 02 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,800 | $0 | Implemented |
AM0620 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,900 | $2,000 | Implemented |