IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

83

matching recommendations
Reset
SIC 2033 Canned Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0193 # 01 Y:2010 01 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $159,261 $64,000 Not Implemented
MI0193 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,000 $1,210 Implemented
MI0193 # 02 Y:2010 02 2010 HEAT WATER WITH EXHAUST HEAT $100,762 $23,000 Implemented
MI0193 # 07 Y:2010 07 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,182 $1,750 Implemented
MI0193 # 06 Y:2010 06 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,565 $4,531 Not Implemented
MI0193 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,004 $40 Implemented
MI0193 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,162 $63,083 Implemented
MI0129 # 02 Y:2006 02 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,075 $1,410 Implemented
MI0129 # 04 Y:2006 04 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $314 $140 Not Implemented
MI0129 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,814 $1,074 Not Implemented
MI0129 # 01 Y:2006 01 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,749 $400 Implemented
MI0129 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $264 $30 Not Implemented
UF0299 # 13 Y:2002 13 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,568 $1,487 Implemented
UF0299 # 12 Y:2002 12 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $126,744 $400,000 Not Implemented
UF0299 # 11 Y:2002 11 2002 RECYCLE FLUORESCENT LAMPS $63 $0 Implemented
UF0299 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,494 $0 Implemented
UF0299 # 07 Y:2002 07 2002 RECOVER WASTE HEAT FROM EQUIPMENT $27,545 $120,962 Not Implemented
UF0299 # 08 Y:2002 08 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $20,543 $0 Implemented
UF0299 # 10 Y:2002 10 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $30,592 $15,000 Not Implemented
UF0299 # 02 Y:2002 02 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $5,901 $1,000 Not Implemented
UF0299 # 09 Y:2002 09 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,134 $0 Implemented
UF0299 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,988 $5,732 Implemented
UF0299 # 06 Y:2002 06 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $45,724 $81,293 Implemented
UF0299 # 04 Y:2002 04 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $65,908 $37,050 Implemented
UF0299 # 03 Y:2002 03 2002 USE PHOTOCELL CONTROLS $13,442 $36,067 Not Implemented