IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

257

matching recommendations
Reset
SIC 2033 Canned Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0582 # 04 Y:2022 04 2022 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $10,294 $2,290 Implemented
SF0582 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,257 $45,587 Implemented
SF0582 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,960 $0 Implemented
SF0582 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,094 $17,764 Implemented
SF0582 # 09 Y:2022 09 2022 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $3,070 $11,782 Implemented
SF0582 # 10 Y:2022 10 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,570 $11,279 Not Implemented
SF0582 # 08 Y:2022 08 2022 INSULATE BARE EQUIPMENT $376 $961 Not Implemented
SF0582 # 02 Y:2022 02 2022 MODIFY STARTUP/SHUTDOWN TIMES $7,144 $0 Implemented
SF0582 # 03 Y:2022 03 2022 INSTALL / REPAIR INSULATION ON STEAM LINES $29,881 $2,290 Implemented
SF0582 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,836 $41,117 Implemented
SF0531 # 02 Y:2018 02 2018 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $88,691 $23,292 Not Implemented
SF0531 # 09 Y:2018 09 2018 INCREASE AMOUNT OF CONDENSATE RETURNED $15,854 $35,361 Not Implemented
SF0531 # 08 Y:2018 08 2018 REPAIR AND ELIMINATE STEAM LEAKS $18,580 $32,000 Not Implemented
SF0531 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $99,894 $0 Not Implemented
SF0531 # 05 Y:2018 05 2018 INSTALL STEAM TRAP $9,614 $6,613 Not Implemented
SF0531 # 03 Y:2018 03 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,968 $3,477 Not Implemented
SF0531 # 06 Y:2018 06 2018 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $20,839 $15,682 Not Implemented
SF0531 # 04 Y:2018 04 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,498 $886 Not Implemented
SF0531 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $54,404 $82,459 Not Implemented
SF0486 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $1,616 $1,456 Not Implemented
SF0486 # 06 Y:2016 06 2016 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $21,035 $22,499 Not Implemented
SF0486 # 03 Y:2016 03 2016 INSTALL STEAM TRAP $59,001 $20,027 Not Implemented
SF0486 # 04 Y:2016 04 2016 UPGRADE CONTROLS ON COMPRESSORS $60,071 $20,763 Implemented
SF0486 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,280 $0 Implemented
SF0486 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $833 $0 Implemented