IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
SIC 2033 Canned Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0910 # 11 Y:2015 11 2015 OPTIMIZE PLANT POWER FACTOR $11,042 $47,988 Not Implemented
OK0910 # 01 Y:2015 01 2015 RECOVER WASTE HEAT FROM EQUIPMENT $8,390 $2,440 Not Implemented
OK0910 # 02 Y:2015 02 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $42,177 $162,050 Not Implemented
OK0910 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,309 $1,250 Implemented
OK0910 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,605 $6,953 Not Implemented
OK0910 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $70,459 $247,939 Implemented
OK0910 # 07 Y:2015 07 2015 INSTALL TIMERS AND/OR THERMOSTATS $2,710 $2,471 Implemented
OK0910 # 08 Y:2015 08 2015 REPAIR AND ELIMINATE STEAM LEAKS $18,886 $375 Implemented
OK0910 # 09 Y:2015 09 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $53,631 $44,000 Not Implemented
OK0910 # 10 Y:2015 10 2015 INSULATE BARE EQUIPMENT $317 $46 Not Implemented
OK0910 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,664 $8,092 Not Implemented
OK0457 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $882 $2,480 Not Implemented
OK0457 # 01 Y:1995 01 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,236 $13,720 Not Implemented
OK0457 # 02 Y:1995 02 1995 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,691 $64 Implemented
OK0457 # 03 Y:1995 03 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $1,741 $4,508 Implemented
OK0457 # 04 Y:1995 04 1995 INSULATE BARE EQUIPMENT $1,344 $3,612 Implemented
OK0457 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,224 $2,077 Implemented
OK0457 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $199 $240 Implemented
OK0457 # 08 Y:1995 08 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $49 $76 Implemented
OK0412 # 02 Y:1993 02 1993 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $74 $3,053 Implemented
OK0412 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,145 $0 Implemented
OK0412 # 04 Y:1993 04 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,747 $5,964 Not Implemented
OK0412 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $713 $0 Not Implemented
OK0412 # 01 Y:1993 01 1993 RECOVER WASTE HEAT FROM EQUIPMENT $5,522 $16,100 Not Implemented
OK0386 # 08 Y:1992 08 1992 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $250 $216 Implemented