IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 2033 Canned Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0528 # 02 Y:2014 02 2014 INSULATE BARE EQUIPMENT $9,196 $7,095 Not Implemented
IA0528 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,031 $10,568 Not Implemented
IA0528 # 04 Y:2014 04 2014 USE PHOTOCELL CONTROLS $2,865 $630 Not Implemented
IA0528 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $453 $525 Not Implemented
IA0528 # 06 Y:2014 06 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $1,974 $1,053 Not Implemented
IA0528 # 07 Y:2014 07 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $408 $970 Not Implemented
IA0528 # 08 Y:2014 08 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $288 $70 Not Implemented
IA0528 # 01 Y:2014 01 2014 HEAT WATER WITH EXHAUST HEAT $14,601 $9,600 Not Implemented
IC0110 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,956 $0 Implemented
IC0110 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $473 $3,388 Implemented
IC0110 # 09 Y:2005 09 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,156 $81,881 Implemented
IC0110 # 08 Y:2005 08 2005 OPTIMIZE PLANT POWER FACTOR $13,904 $70,000 Implemented
IC0110 # 07 Y:2005 07 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $7,443 $15,000 Not Implemented
IC0110 # 05 Y:2005 05 2005 IMPROVE COMBUSTION CONTROL CAPABILITY $13,789 $3,500 Implemented
IC0110 # 04 Y:2005 04 2005 REPAIR AND ELIMINATE STEAM LEAKS $6,051 $400 Implemented
IC0110 # 03 Y:2005 03 2005 REPAIR OR REPLACE STEAM TRAPS $29,831 $1,638 Implemented
IC0110 # 02 Y:2005 02 2005 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM $79,621 $634,572 Not Implemented
IC0110 # 01 Y:2005 01 2005 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $106,617 $213,420 Implemented
WI0383 # 05 Y:2000 05 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,875 $0 Not Implemented
WI0383 # 04 Y:2000 04 2000 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,492 $11,550 Implemented
WI0383 # 03 Y:2000 03 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,946 $22,500 Implemented
WI0383 # 02 Y:2000 02 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,801 $20,000 Not Implemented
WI0383 # 06 Y:2000 06 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,257 $740 Implemented
WI0383 # 01 Y:2000 01 2000 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $41,291 $72,000 Not Implemented
WI0133 # 05 Y:1991 05 1991 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $452 $800 Implemented