Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
56
matching recommendationsSIC | 2033 | Canned Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0244 # 14 Y:2002 | 14 | 2002 | OPTIMIZE PLANT POWER FACTOR | $2,389 | $3,651 | Not Implemented |
SF0244 # 01 Y:2002 | 01 | 2002 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $31,136 | $7,960 | Not Implemented |
SF0244 # 02 Y:2002 | 02 | 2002 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $107,810 | $50,000 | Implemented |
SF0244 # 03 Y:2002 | 03 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $36,936 | $19,350 | Not Implemented |
SF0244 # 04 Y:2002 | 04 | 2002 | REDUCE FLUID FLOW RATES | $31,494 | $16,627 | Implemented |
SF0244 # 05 Y:2002 | 05 | 2002 | INSTALL OCCUPANCY SENSORS | $2,185 | $1,200 | Not Implemented |
SF0244 # 06 Y:2002 | 06 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,304 | $4,110 | Implemented |
SF0244 # 07 Y:2002 | 07 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $21,274 | $17,580 | Implemented |
SF0244 # 08 Y:2002 | 08 | 2002 | REDUCE EXCESSIVE BOILER BLOWDOWN | $6,671 | $6,000 | Implemented |
SF0244 # 09 Y:2002 | 09 | 2002 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $2,672 | $2,500 | Not Implemented |
SF0244 # 10 Y:2002 | 10 | 2002 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $319 | $393 | Not Implemented |
SF0244 # 11 Y:2002 | 11 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,487 | $14,055 | Not Implemented |
SF0244 # 12 Y:2002 | 12 | 2002 | TREAT AND REUSE RINSE WATERS | $218,183 | $18,705 | n/a |
SF0244 # 15 Y:2002 | 15 | 2002 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $72,375 | $160,000 | Not Implemented |
SF0244 # 16 Y:2002 | 16 | 2002 | INSTALL AUTOMATIC PACKING EQUIPMENT | $101,519 | $350,000 | Implemented |
SF0244 # 13 Y:2002 | 13 | 2002 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $8,739 | $0 | Not Implemented |
LM0036 # 11 Y:2002 | 11 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $199,710 | $14,000 | Implemented |
LM0036 # 06 Y:2002 | 06 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,928 | $23,600 | Not Implemented |
LM0036 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $203,445 | $95,480 | Implemented |
LM0036 # 02 Y:2002 | 02 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,227 | $1,335 | Implemented |
LM0036 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,015 | $550 | Implemented |
LM0036 # 04 Y:2002 | 04 | 2002 | UPGRADE CONTROLS ON COMPRESSORS | $19,570 | $300 | Not Implemented |
LM0036 # 05 Y:2002 | 05 | 2002 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $21,342 | $4,800 | Implemented |
LM0036 # 09 Y:2002 | 09 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $145,152 | $2,000 | Not Implemented |
LM0036 # 12 Y:2002 | 12 | 2002 | DEVELOP STANDARD OPERATING PROCEDURES | $354,257 | $45,500 | Implemented |