Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
59
matching recommendationsSIC | 2033 | Canned Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MAS032 # 01 Y:2012 | 01 | 2012 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $8,920 | $8,000 | Not Implemented |
MAS032 # 02 Y:2012 | 02 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $8,141 | $8,000 | Not Implemented |
MAS032 # 03 Y:2012 | 03 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,897 | $38,000 | Not Implemented |
MAS032 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,230 | $20,000 | Not Implemented |
MAS032 # 05 Y:2012 | 05 | 2012 | INSULATE BARE EQUIPMENT | $1,008 | $730 | Not Implemented |
MAS032 # 06 Y:2012 | 06 | 2012 | INSULATE BARE EQUIPMENT | $256 | $400 | Implemented |
SF0423 # 13 Y:2012 | 13 | 2012 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $26,214 | $85,490 | Not Implemented |
SF0423 # 01 Y:2012 | 01 | 2012 | CLOSE OFF UNNEEDED STEAM LINES | $417 | $0 | Implemented |
SF0423 # 02 Y:2012 | 02 | 2012 | REPAIR AND ELIMINATE STEAM LEAKS | $4,512 | $0 | Implemented |
SF0423 # 03 Y:2012 | 03 | 2012 | INSTALL SET-BACK TIMERS | $3,656 | $0 | Implemented |
SF0423 # 04 Y:2012 | 04 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $5,375 | $3,925 | Implemented |
SF0423 # 05 Y:2012 | 05 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,157 | $5,079 | Not Implemented |
SF0423 # 06 Y:2012 | 06 | 2012 | INSULATE BARE EQUIPMENT | $4,091 | $4,108 | Implemented |
SF0423 # 07 Y:2012 | 07 | 2012 | INSTALL OCCUPANCY SENSORS | $14,919 | $21,094 | Implemented |
SF0423 # 08 Y:2012 | 08 | 2012 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $406 | $1,040 | Implemented |
SF0423 # 09 Y:2012 | 09 | 2012 | INSULATE BARE EQUIPMENT | $2,993 | $7,655 | Implemented |
SF0423 # 10 Y:2012 | 10 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $42,535 | $127,175 | Implemented |
SF0423 # 11 Y:2012 | 11 | 2012 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $104,307 | $469,980 | Not Implemented |
SF0423 # 12 Y:2012 | 12 | 2012 | RECOVER AND REUSE COOLING WATER | $4,700 | $700 | Implemented |
AM0620 # 02 Y:2012 | 02 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,800 | $0 | Implemented |
AM0620 # 11 Y:2012 | 11 | 2012 | USE SYNTHETIC LUBRICANT | $515 | $0 | Not Implemented |
AM0620 # 07 Y:2012 | 07 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,505 | $750 | Not Implemented |
AM0620 # 08 Y:2012 | 08 | 2012 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,390 | $0 | Implemented |
AM0620 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,900 | $2,000 | Implemented |
AM0620 # 10 Y:2012 | 10 | 2012 | INSULATE BARE EQUIPMENT | $1,030 | $1,650 | Implemented |