Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
180
matching recommendationsSIC | 2034 | Dehydrated Fruits, Vegetables, Soups |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0227 # 01 Y:2012 | 01 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $63,004 | $11,425 | Implemented |
MI0227 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,352 | $21,342 | Not Implemented |
MI0227 # 11 Y:2012 | 11 | 2012 | INSTALL OCCUPANCY SENSORS | $3,170 | $3,500 | Not Implemented |
MI0227 # 10 Y:2012 | 10 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,975 | $3,480 | Not Implemented |
MI0227 # 09 Y:2012 | 09 | 2012 | HEAT WATER WITH EXHAUST HEAT | $6,137 | $8,859 | Not Implemented |
MI0227 # 08 Y:2012 | 08 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,569 | $8,859 | Not Implemented |
MI0227 # 07 Y:2012 | 07 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,036 | $13,230 | Not Implemented |
MI0227 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,918 | $1,660 | Implemented |
MI0227 # 05 Y:2012 | 05 | 2012 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $13,886 | $142,619 | Implemented |
MI0227 # 06 Y:2012 | 06 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,306 | $12,160 | Implemented |
SF0413 # 01 Y:2012 | 01 | 2012 | COMBINE UTILITY METERS | $27,096 | $10,000 | Not Implemented |
SF0413 # 02 Y:2012 | 02 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $936 | $380 | Implemented |
SF0413 # 03 Y:2012 | 03 | 2012 | INSULATE BARE EQUIPMENT | $1,032 | $1,872 | Not Implemented |
SF0413 # 04 Y:2012 | 04 | 2012 | INSTALL OCCUPANCY SENSORS | $380 | $2,139 | Not Implemented |
SF0413 # 05 Y:2012 | 05 | 2012 | INSULATE BARE EQUIPMENT | $256 | $684 | Not Implemented |
SF0413 # 06 Y:2012 | 06 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $40,499 | $409,247 | Implemented |
SU0303 # 06 Y:2011 | 06 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,973 | $9,016 | Not Implemented |
SU0303 # 07 Y:2011 | 07 | 2011 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $4,074 | $16,668 | Not Implemented |
SU0303 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,814 | $10,990 | Not Implemented |
SU0303 # 02 Y:2011 | 02 | 2011 | INSTALL OCCUPANCY SENSORS | $858 | $486 | Implemented |
SU0303 # 01 Y:2011 | 01 | 2011 | INSULATE FEEDWATER TANK | $273 | $83 | Implemented |
SU0303 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $104 | $128 | Implemented |
SU0303 # 05 Y:2011 | 05 | 2011 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $103 | $275 | Not Implemented |
UF0400 # 07 Y:2007 | 07 | 2007 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $653 | $511 | Not Implemented |
UF0400 # 03 Y:2007 | 03 | 2007 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $1,930 | $624 | Implemented |