Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
180
matching recommendationsSIC | 2034 | Dehydrated Fruits, Vegetables, Soups |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0400 # 03 Y:2007 | 03 | 2007 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $1,930 | $624 | Implemented |
UF0400 # 04 Y:2007 | 04 | 2007 | INSTALL OCCUPANCY SENSORS | $4,182 | $928 | Implemented |
UF0400 # 05 Y:2007 | 05 | 2007 | KEEP EQUIPMENT CLEAN | $3,059 | $87 | Implemented |
UF0400 # 06 Y:2007 | 06 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,583 | $21,927 | Not Implemented |
UF0400 # 07 Y:2007 | 07 | 2007 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $653 | $511 | Not Implemented |
UF0400 # 08 Y:2007 | 08 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $111,825 | $230 | Not Implemented |
OR0508 # 01 Y:2006 | 01 | 2006 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $69,500 | $30,000 | Implemented |
OR0508 # 02 Y:2006 | 02 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $53,000 | $2,000 | Implemented |
OR0508 # 03 Y:2006 | 03 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $24,700 | $5,000 | Implemented |
OR0508 # 04 Y:2006 | 04 | 2006 | BURN A LESS EXPENSIVE GRADE OF FUEL | $375,000 | $480,000 | Not Implemented |
OR0508 # 05 Y:2006 | 05 | 2006 | OPTIMIZE PLANT POWER FACTOR | $18,300 | $31,500 | Not Implemented |
OR0508 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,200 | $3,200 | Implemented |
OR0508 # 07 Y:2006 | 07 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,100 | $12,000 | Implemented |
OR0508 # 08 Y:2006 | 08 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $5,100 | $30,000 | Implemented |
OR0508 # 09 Y:2006 | 09 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,700 | $6,900 | Not Implemented |
SF0314 # 01 Y:2005 | 01 | 2005 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $4,353 | $0 | Implemented |
SF0314 # 02 Y:2005 | 02 | 2005 | REPAIR AND ELIMINATE STEAM LEAKS | $6,788 | $0 | Implemented |
SF0314 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $258 | $0 | Implemented |
SF0314 # 04 Y:2005 | 04 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,926 | $807 | Not Implemented |
SF0314 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,186 | $14,112 | Not Implemented |
SF0314 # 06 Y:2005 | 06 | 2005 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $20,484 | $30,250 | Not Implemented |
SF0314 # 07 Y:2005 | 07 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,127 | $2,564 | Not Implemented |
SF0314 # 08 Y:2005 | 08 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,436 | $5,848 | Implemented |
SF0314 # 09 Y:2005 | 09 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,342 | $4,848 | Implemented |
SF0314 # 10 Y:2005 | 10 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $447 | $2,408 | Not Implemented |