Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2011 |
Principal Product | freeze-dried foods |
NAICS | 311423 - Dried and Dehydrated Food Manufacturing |
SIC | 2034 - Dehydrated Fruits, Vegetables, Soups |
Sales | $10,000,000-$50,000,000 |
# of Employees | 45 |
Plant Area (Sq.Ft.) | 70,000 |
Annual Production | 2,972,882 Pieces |
Production Hrs. Annual | 8,400 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $171,257 | 2,336,326 | kWh | $0.07 |
Electricity Demand | $74,812 | 4,976 | kW-months/year | $15.03 |
Electricity Fees | $6,327 | - | $ | - |
Natural Gas | $144,590 | 16,272 | MMBtu | $8.89 |
TOTAL ENERGY COSTS | $446,986 | |||
RECOMMENDED SAVINGS* | $15,199 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,235 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2123 INSULATE FEEDWATER TANK |
Savings: $273 Cost: $83 |
- | - | - | - | $273 | 31 | - | - |
- - kWh |
- - kW-months/year |
$273 31 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $858 Cost: $486 |
$858 | 11,659 | - | - | - | - | - | - |
$858 11,659 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $104 Cost: $128 |
$71 | 964 | $20 | 1 | - | - | $13 | - |
$71 964 kWh |
$20 1 kW-months/year |
- - MMBtu |
$13 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,814 Cost: $10,990 |
$5,281 | 71,752 | $1,533 | 102 | - | - | - | - |
$5,281 71,752 kWh |
$1,533 102 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES |
Savings: $103 Cost: $275 |
$103 | 1,396 | - | - | - | - | - | - |
$103 1,396 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,973 Cost: $9,016 |
$2,973 | 41,222 | - | - | - | - | - | - |
$2,973 41,222 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $4,074 Cost: $16,668 |
$(-2,411) | (-32,760) | $(-703) | (-47) | - | - | $7,188 | - |
$(-2,411) (-32,760) kWh |
$(-703) (-47) kW-months/year |
- - MMBtu |
$7,188 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $15,199 Cost: $37,646 |
$6,875 | 94,233 | $850 | 57 | $273 | 31 | $7,201 | - | $6,875 94,233 kWh |
$850 57 kW-months/year |
$273 31 MMBtu |
$7,201 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,235 Cost: $697 |
$929 | 12,623 | $20 | 1 | $273 | 31 | $13 | - | $929 12,623 kWh |
$20 1 kW-months/year |
$273 31 MMBtu |
$13 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost |