IAC logo
IAC Assessment: SU0303
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0303
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2011
Principal Product freeze-dried foods
NAICS 311423 - Dried and Dehydrated Food Manufacturing
SIC 2034 - Dehydrated Fruits, Vegetables, Soups
Sales $10,000,000-$50,000,000
# of Employees 45
Plant Area (Sq.Ft.) 70,000
Annual Production 2,972,882 Pieces
Production Hrs. Annual 8,400
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $171,257 2,336,326 kWh $0.07
Electricity Demand $74,812 4,976 kW-months/year $15.03
Electricity Fees $6,327 - $ -
Natural Gas $144,590 16,272 MMBtu $8.89
TOTAL ENERGY COSTS $446,986
RECOMMENDED SAVINGS* $15,199 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,235
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2123 INSULATE FEEDWATER TANK Savings:
$273
Cost:
$83
- - - - $273 31 - - -
-
kWh
-
-
kW-months/year
$273
31
MMBtu
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$858
Cost:
$486
$858 11,659 - - - - - - $858
11,659
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$104
Cost:
$128
$71 964 $20 1 - - $13 - $71
964
kWh
$20
1
kW-months/year
-
-
MMBtu
$13
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,814
Cost:
$10,990
$5,281 71,752 $1,533 102 - - - - $5,281
71,752
kWh
$1,533
102
kW-months/year
-
-
MMBtu
-
-
$
05: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$103
Cost:
$275
$103 1,396 - - - - - - $103
1,396
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,973
Cost:
$9,016
$2,973 41,222 - - - - - - $2,973
41,222
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$4,074
Cost:
$16,668
$(-2,411) (-32,760) $(-703) (-47) - - $7,188 - $(-2,411)
(-32,760)
kWh
$(-703)
(-47)
kW-months/year
-
-
MMBtu
$7,188
-
$
TOTAL RECOMMENDED Savings:
$15,199
Cost:
$37,646
$6,875 94,233 $850 57 $273 31 $7,201 - $6,875
94,233
kWh
$850
57
kW-months/year
$273
31
MMBtu
$7,201
-
$
TOTAL IMPLEMENTED Savings:
$1,235
Cost:
$697
$929 12,623 $20 1 $273 31 $13 - $929
12,623
kWh
$20
1
kW-months/year
$273
31
MMBtu
$13
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost