IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

424

matching recommendations
Reset
SIC 2035 Pickles, Sauces, And Salad Dressings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0260 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $722 $50 Implemented
IA0260 # 05 Y:2000 05 2000 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $7,513 $14,000 Implemented
IA0260 # 06 Y:2000 06 2000 MINIMIZE WATER USAGE $243 $44 Implemented
IA0260 # 07 Y:2000 07 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $41,184 $90,000 Implemented
MO0278 # 01 Y:2000 01 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,339 $4,745 Not Implemented
MO0278 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $350 $175 Not Implemented
MO0278 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $911 $80 Not Implemented
MO0278 # 04 Y:2000 04 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $22,500 $0 Implemented
MO0278 # 05 Y:2000 05 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $3,000 $0 Implemented
MO0278 # 06 Y:2000 06 2000 AUTOMATE FINISHING PROCESS $25,974 $767 Not Implemented
MO0278 # 07 Y:2000 07 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $17,143 $2,100 Not Implemented
OR0360 # 01 Y:1999 01 1999 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $9,585 $2,840 Implemented
OR0360 # 02 Y:1999 02 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,909 $0 Implemented
OR0360 # 03 Y:1999 03 1999 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $6,248 $20,000 Not Implemented
OR0360 # 04 Y:1999 04 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $18,785 $67,680 Not Implemented
OR0360 # 05 Y:1999 05 1999 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $17,520 $2,000 Implemented
UD0578 # 01 Y:1999 01 1999 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $323,997 $26,940 Implemented
UD0578 # 02 Y:1999 02 1999 DEVELOP STANDARD OPERATING PROCEDURES $26,052 $0 Not Implemented
UD0578 # 03 Y:1999 03 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $19,500 $8,600 Implemented
UD0578 # 04 Y:1999 04 1999 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $17,671 $3,000 Implemented
UD0578 # 05 Y:1999 05 1999 USE POWER DURING OFF-PEAK PERIODS $8,867 $0 Not Implemented
UD0578 # 06 Y:1999 06 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,242 $0 Implemented
UD0578 # 07 Y:1999 07 1999 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $3,939 $6,750 Not Implemented
UD0578 # 08 Y:1999 08 1999 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,734 $13,000 Not Implemented
UD0578 # 09 Y:1999 09 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,220 $230 Not Implemented