Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
424
matching recommendationsSIC | 2035 | Pickles, Sauces, And Salad Dressings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0286 # 01 Y:1997 | 01 | 1997 | BURN WOOD BY-PRODUCTS FOR HEAT | $907 | $0 | Implemented |
OR0286 # 02 Y:1997 | 02 | 1997 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $19,123 | $16,000 | Not Implemented |
OR0286 # 03 Y:1997 | 03 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $459 | $1,538 | Not Implemented |
GT0605 # 01 Y:1996 | 01 | 1996 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $18,246 | $675 | Implemented |
GT0605 # 02 Y:1996 | 02 | 1996 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,110 | $3,500 | Implemented |
GT0605 # 03 Y:1996 | 03 | 1996 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $3,308 | $103 | Implemented |
GT0605 # 04 Y:1996 | 04 | 1996 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,090 | $1,450 | Implemented |
GT0605 # 05 Y:1996 | 05 | 1996 | METER WASTE WATER | $14,720 | $0 | Implemented |
GT0605 # 06 Y:1996 | 06 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,120 | $4,300 | Implemented |
GT0605 # 07 Y:1996 | 07 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,000 | $4,908 | Implemented |
GT0605 # 08 Y:1996 | 08 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,205 | $66 | Not Implemented |
GT0605 # 09 Y:1996 | 09 | 1996 | SELL / OFFER BY-PRODUCT AS ANIMAL FEED | $260,000 | $49,800 | Implemented |
OR0285 # 01 Y:1996 | 01 | 1996 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $33,432 | $0 | Implemented |
OR0285 # 02 Y:1996 | 02 | 1996 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $464 | $142 | Implemented |
OR0285 # 03 Y:1996 | 03 | 1996 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $36,382 | $10,450 | Implemented |
OR0285 # 04 Y:1996 | 04 | 1996 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,815 | $0 | Not Implemented |
OR0285 # 05 Y:1996 | 05 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,671 | $15,663 | Implemented |
OR0285 # 06 Y:1996 | 06 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $686 | $2,582 | Not Implemented |
SF0098 # 01 Y:1996 | 01 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,754 | $17,735 | Not Implemented |
SF0098 # 02 Y:1996 | 02 | 1996 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,295 | $6,792 | Not Implemented |
SF0098 # 03 Y:1996 | 03 | 1996 | INSTALL SPECTRAL REFLECTORS / DELAMP | $4,784 | $1,330 | Implemented |
SF0098 # 04 Y:1996 | 04 | 1996 | INSTALL OCCUPANCY SENSORS | $4,411 | $2,495 | Not Implemented |
SF0098 # 05 Y:1996 | 05 | 1996 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,145 | $334 | Implemented |
SF0098 # 06 Y:1996 | 06 | 1996 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,634 | $4,600 | Implemented |
SF0098 # 07 Y:1996 | 07 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,578 | $1,349 | Implemented |