Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
Reset
SIC 2035 Pickles, Sauces, And Salad Dressings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0549 # 09 Y:2020 09 2020 REDUCE WATER USE WITH COUNTER CURRENT RINSING $44,084 $48,094 Not Implemented
SF0549 # 08 Y:2020 08 2020 USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING $22,925 $1,810 Implemented
SF0549 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,119 $19,959 Not Implemented
SF0549 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $475 $1,214 Implemented
SF0549 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,204 $25,635 Implemented
SF0549 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,182 $120 Not Implemented
SF0549 # 07 Y:2020 07 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $67,154 $343,660 Not Implemented
SF0549 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,719 $0 Implemented
SF0549 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $403 $1,776 Implemented
SF0408 # 01 Y:2012 01 2012 AIR CONDITION ONLY SPACE NECESSARY $4,725 $0 Not Implemented
SF0408 # 06 Y:2012 06 2012 USE SOLAR HEAT TO MAKE ELECTRICTY $231,136 $1,514,353 Implemented
SF0408 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,571 $80 Implemented
SF0408 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $3,255 $11,297 Implemented
SF0408 # 04 Y:2012 04 2012 UTILIZE A LESS EXPENSIVE COOLING METHOD $3,344 $4,267 Not Implemented
SF0408 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,111 $0 Implemented
SD0436 # 09 Y:2011 09 2011 INSTALL SKYLIGHTS $6,479 $14,200 Not Implemented
SD0436 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,598 $52,274 Implemented
SD0436 # 07 Y:2011 07 2011 INCREASE AMOUNT OF CONDENSATE RETURNED $12,828 $20,000 Implemented
SD0436 # 08 Y:2011 08 2011 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $283,465 $607,200 Not Implemented
SD0436 # 10 Y:2011 10 2011 UPGRADE OBSOLETE EQUIPMENT $20,930 $61,200 Not Implemented
SD0436 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,198 $2,100 Implemented
SD0436 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,180 $2,000 Implemented
SD0436 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $7,888 $6,050 Implemented
SD0436 # 04 Y:2011 04 2011 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,787 $1,535 Implemented
SD0436 # 05 Y:2011 05 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $26,197 $22,700 Not Implemented