IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 2035 Pickles, Sauces, And Salad Dressings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0605 # 09 Y:1996 09 1996 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $260,000 $49,800 Implemented
GT0605 # 08 Y:1996 08 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,205 $66 Not Implemented
GT0605 # 07 Y:1996 07 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,000 $4,908 Implemented
GT0605 # 06 Y:1996 06 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,120 $4,300 Implemented
GT0605 # 05 Y:1996 05 1996 METER WASTE WATER $14,720 $0 Implemented
GT0605 # 04 Y:1996 04 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,090 $1,450 Implemented
GT0605 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN WATER LINES AND VALVES $3,308 $103 Implemented
GT0605 # 02 Y:1996 02 1996 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,110 $3,500 Implemented
GT0605 # 01 Y:1996 01 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $18,246 $675 Implemented
GT0578 # 06 Y:1996 06 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,090 $34,520 Implemented
GT0578 # 07 Y:1996 07 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $850 $2,100 Not Implemented
GT0578 # 05 Y:1996 05 1996 USE DEMAND CONTROLLER OR LOAD SHEDDER $21,460 $0 Not Implemented
GT0578 # 04 Y:1996 04 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $3,970 $500 Implemented
GT0578 # 03 Y:1996 03 1996 INCREASE AMOUNT OF CONDENSATE RETURNED $27,914 $12,000 Implemented
GT0578 # 02 Y:1996 02 1996 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $2,045 $1,000 Implemented
GT0578 # 01 Y:1996 01 1996 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $21,137 $50,000 Implemented
GT0306 # 01 Y:1987 01 1987 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $23,465 $0 Implemented
GT0306 # 05 Y:1987 05 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $563 $778 Not Implemented
GT0306 # 04 Y:1987 04 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $187 $102 Not Implemented
GT0306 # 03 Y:1987 03 1987 RECOVER WASTE HEAT FROM EQUIPMENT $11,954 $20,000 Not Implemented
GT0306 # 02 Y:1987 02 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $565 $300 Implemented